My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCRes_80-23
FalconHeights
>
City Council
>
Resolutions
>
198x
>
1980
>
CCRes_80-23
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/14/2009 10:05:36 AM
Creation date
7/10/2009 9:32:11 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
August 13, 1980 <br />CITY OF FALCON HEIGHTS <br />1644 W. LARPENTEUR <br />FALCON HEIGHTS, MN 55113 <br />~4-5050 <br />HEATING PERMIT <br />Flil'. SC1lEDULL; <br />Fee Item <br />$ 5.00 Each Gas Appliance (machine, device, heater, range, refrigerator, gas <br />dryer, gas stove, gas hot water Yieater or other appliance) requiring <br />the use of manufactured gas, natural gas or liquid petroleum gas. <br />$ 5.00 Gas Piping $500.00 valuation or less (repair or installation) <br />$ 2.00 Each additional $500.00 cost of repair or installation <br />Gas Burners or Gas Burner E ui ment and Oil Burnin Furnaces or Boilers <br />$ 7.50 First 200,000 BTU input o less <br />$ 1.25 Each additional 100,000 input or fraction thereof <br />$175.00 Maximum fee for each unit <br /> Steam, Warm Air or Hot Water Heating System <br />$ 15.00 First 200,000 BTU input for construction or alteration of any warm air <br /> furnace duct work <br />$ 2.00 Each additional 100,000 BTU input or fraction <br />$ 15.00 First 200,000 BTU input per unit for installation or replacement of each <br /> steam or hot water system <br /> 2.00 Each additional 100,000 BTUs or fraction thereof (240 x EDR = BTUs/hr) <br /> 7.50 Per unit on unit heaters, based on first 100,000 BTU input <br />$ 1.25 Each additional 100,000 BTU input or fraction thereof <br /> Incinerators <br />$ 5.00 Installation or repair of each domestic incinerator <br />$ 20.00 Installation or repair of each commercial incinerator <br />Air Conditioning and Refrigeration Work <br />$ 10.00 First 5 tons on any air conditioning or refrigeration project (60,000 BTUs) <br />$ 1.00 Each additional ton or fraction thereof (12,000 BTUs) <br />$175.00 Maximum fee per unit <br />$ 15.00 First 5 tons (60,000 BTUs) of cooling for duct work for air conditioning <br />$ 1.50 Each ton (12,000 BTUs) or fraction thereof over first 5 tons for duct <br />work for air conditioning <br />Ventilating Systems <br />$ 8.00 First 2,000 CFM per unit <br />$ 3.00 Each additional 1,000 CFM or fraction thereof per unit <br />$ 3.00 Each bathroom exhaust fan in a multiple dwelling <br />Solar Heating <br />$ 15.00 Each installation <br />• <br />
The URL can be used to link to this page
Your browser does not support the video tag.