behind the light and shelter placement, since the existing light is a <br />major concern of many of the residents. <br />Site amenities have been ordered, and the benches have already <br />arrived. The benches are the same pattern and style as those in the <br />Community Park and Curtiss Field, but with recycled material planks <br />instead of wood. It is felt that concrete pads under the benches are <br />not needed, considering the level of use anticipated. The tables will <br />be of the same coated metal mesh material as those in the other parks. <br />The order was placed for wheelchair accessible tables, which will be <br />distributed to each park in exchange for existing tables. Trash <br />containers were selected which match the recycled material benches, <br />however they are not being ordered yet, but will be ordered for all the <br />parks later. Exercise stations have been ordered, and will take longer <br />to get. <br />Three "Rules" signs were ordered, for placement at the main <br />entrances to the park. <br />An unplanned bonus element has been added to the Grove Park. A <br />four-ton boulder was found during the nearby street construction, and <br />offered to the parks department. It was first suggested that it be <br />placed in the new prairie at Community Park, but at the request of Grove <br />residents, it was placed in the southwest corner of Grove Park. Carol <br />Weisberg organized a group of neighborhood children to clean the <br />boulder, and Commission members who have seen the boulder say it looks <br />great, a wonderful addition to the park. Carol W. and Sue also noted <br />that in general, the street construction crew have been very considerate <br />and pleasant. <br />D-3: Park Capital Improvement Program. Carol K. reviewed the proposed <br />budget. According to Sue Hoyt, we will be switching from an improvement <br />mode of planning to a maintenance mode, now that most of the <br />improvements to the park system have been made. Improvements slated for <br />1994 at Community Park include a volleyball sand pit, rehabilitation of <br />the trail (the section not done by the county), replacement of <br />Vita-course stations. Additional funds are budgeted for replacement of <br />lights at the hockey rink, which will be carried over if not needed this <br />year. Items not included in the proposed budget but discussed earlier <br />by the Commission, include a windscreen for tennis courts (estimated at <br />X1200 for 2 sides) and a music system for the skating rinks Cwhich will <br />be from 1993 funds). The lump sum designated for Park Landscaping is <br />not dedicated towards any specific park. The 1995 item of Trail System <br />Improvements refers to the anticipated trail to be created along Larpenteur, <br />when that street is reconstructed. <br />D-4: Curtiss Field Update. There have been reports of inappropriate <br />activity at the park. Hoth the police and Job Corps security will do <br />additional patrolling. Also, the telephone installed there was to have <br />been out-going only, but was installed as incoming and out-going. This <br />will be rectified this week. <br />/ l <br />4.~M i ~'~'M, <br />