My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCAgenda_92Oct28
FalconHeights
>
City Council
>
City Council Agenda Packets
>
199x
>
1992
>
CCAgenda_92Oct28
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/4/2010 1:14:38 PM
Creation date
11/4/2010 1:14:30 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
91
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4. Mechanical Permit Fees. <br /> Fee Item <br /> $25.00 1. Basic <br /> 5.00 2. Each appliance. (machine, device, heater, <br /> range, refrigerator, gas dryer, gas <br /> stove, gas hot water heater or other <br /> appliance) requiring the use of <br /> manufactured gas, natural gas or liquid <br /> petroleum gas <br /> 10.00 3. Gas Piping. $500 valuation or less <br /> (repair or installation) <br /> 4.00 Each additional $500 cost of repair or <br /> installation <br /> 4. Gas Burners or Gas Burner Equipment or <br /> Oil Burning Furnace or Boilers <br /> 20.00 First 200,000 BTU input or less <br /> 3.00 Each additional 1,000 input or fraction <br /> thereof <br /> 175.00 Maximum fee for each unit <br /> 5. Steam, Water, Air or Hot Water Heating <br /> System. <br /> 25.00 First 200,000 BYU input for construction <br /> of alteration or any warm air furnace <br /> duct work <br /> 4.00 Each additional 100,000 BTU input or <br /> fraction <br /> 25.00 First 200,000 BTU input per unit for <br /> construction of alteration or any warm <br /> air furnace duct work <br /> 4.00 Each additional 100,000 BTU input or <br /> fraction <br /> 25.00 First 200,000 BTU input per unit for <br /> installation or replacement of each <br /> steam or hot water system <br /> 4.00 Each additional 100,000 BTU's or fraction <br /> thereof (240 x EDR BTU's /hr) <br /> 15.00 Per unit on unit heaters, based on first <br /> 100,000 BTU input <br /> 3.00 Each additional 100,000 BTU input or <br /> fraction thereof <br /> 6. Incinerators <br /> 15.00 Installation or repair of each domestic <br /> incinerator <br /> 50.00 Installation or repair of each commercial <br /> incinerator <br /> 7. Air Conditioning and Refrigerator Work <br /> 20.00 First 5 tons of any air conditioning or <br /> refrigeration project (60,000 BTU's) <br /> 3.00 Each additional ton or fraction thereof <br />
The URL can be used to link to this page
Your browser does not support the video tag.