Laserfiche WebLink
(12,000 BTU's) <br /> 175.00 Maximum fee per unit <br /> 25.00 First 5 tons (60,000 BTU's) of cooling <br /> for duct work for air conditioning <br /> 3.00 Each ton (12,000 BTU's or fraction <br /> thereof over first 5 tons for duct work <br /> for air conditioning <br /> 8. Ventilating Systems <br /> 25.00 First 2,000 CFM per unit <br /> 5.00 Each additional 1,000 CFM or fraction <br /> thereof per unit <br /> 5.00 Each bathroom exhaust fan in a multiple <br /> dwelling <br /> 9. Solar Heating <br /> 25.00 Each installation <br /> 5. Plumbing Permit Fees <br /> 25.00 Basic <br /> 7.00 Per fixture <br /> 6. Sewer Connection or Repair <br /> 25.00 <br /> 7. Water Connections <br /> 62.00 3/4" <br /> 115.00 1" <br /> 265.00 1 -1/2" <br /> 470.00 2" <br /> 1,080.00 3" <br /> C. Planning Fees <br /> 500.00 Comp Plan Amendment <br /> 165.00 Conditional Use Permit <br /> $250.00 150.00 Lot Split <br /> $500.00 300.00 P.U.D. <br /> $500.00 300.00 Re- zoning <br /> 300.00 Subdivision (more than one new lot) <br /> $50.00 45.00 Variance <br /> D. Facility Rental Fees. Private use of public facilities <br /> is permitted on a space available basis. Reservations <br /> are required and security deposits may be required for <br /> private use of the following community facilities: <br />