Laserfiche WebLink
JUN -18 -93 FR 13:32 MAIER STEWART ASSOC, FAX NO 7740838 P.04 <br /> DESCR PT TON: The watermain improvements in Schedule 7.0 were included in the bid to <br /> to determine if the min improvements were ecomic ally feasible to <br /> to replace. The testing items were also included in the bid as a responsibilty <br /> of the contractor. After analyzing the bid of F.M. Frattalone Excavating <br /> Grading, Inc. it was determined that most of the watermain improvements <br /> and contractor testing should be eliminated from the contract. <br /> PURPOSE OF <br /> CHANGE ORDER: The purpose of this change order is to delete most of the watermain <br /> improvement items on Scbedulc 7.0 and all of the contractor testing items. <br /> A complete summary of each bid item to be deleted is shown on the <br /> attachment. <br />