Laserfiche WebLink
Saw purchase (to facilitate sign frame replacement) $300 -400 <br /> Game Time horizontal ladder station $675 <br /> Game Time sit -up stations $350 <br /> New sign faces for two new stations $100 <br /> Pathway Rehabilitation <br /> While the entire pathway is in need of rehabilitation, we suggest that two different <br /> methods of repair be employed in two different areas of the trail. Complete rebuilding of <br /> the trail appears to be necessary for 1,300 linear feet on the east and southeast areas of the <br /> park. These trail areas currently consist of just a remnant of the original trail as it is only <br /> about a foot in width in most areas. Rebuilding in these areas will consist of excavating <br /> the trail area to a depth of 4 inches and 6 feet wide, application of a preemergant <br /> herbicide, application of crushed limestone and ag -lime, and grading and compaction of <br /> the site. Repair of the remaining trail is considered possible without excavating and <br /> removals of the existing materials. These areas would be treated with a herbicide, <br /> augmented with a top dressing of additional ag -lime, graded and compacted. Pete feels <br /> that these areas in need of lesser work can be accomplished effectively in -house with the <br /> public works staff Although the work will require equipment that the City does not have, <br /> indications are that the City of Roseville is willing to make their equipment available to <br /> us for this project. <br /> The following expenditures are recommended in an effort to rehabilitate the pathway: <br /> Contracting with for the rebuilding of 1,200 linear feet of pathway <br /> at a cost of (see attached bids). <br /> The purchase of herbicide, crushed limestone, and ag -lime for the public works star <br /> to repair 1,600 linear feet of trail. Required material quanities are estimated to cost <br />