Laserfiche WebLink
POLICY POLICY POLICY POLICY POLICY POLICY POLICY POLICY <br /> Meeting Date: 10/26/94 <br /> Agenda Item: P 4 <br /> CITY OF FALCON HEIGHTS <br /> REQUEST FOR COUNCIL CONSIDERATION <br /> ITEM DESCRIPTION: Consideration of the feasibility study for alley <br /> reconstruction <br /> SUBMITTED BY: Terry Maurer, City Engineer <br /> REVIEWED BY: Susan Hoyt, City Administrator <br /> EXPLANATION /SUMMARY: <br /> (prepared by Susan Hoyt) <br /> The city engineer, Terry Maurer, is submitting a feasibility study on the city's <br /> proposed alley reconstruction program. Of note: <br /> The study identifies and recommends that five alleys in the Northome <br /> neighborhood that are in poor condition be reconstructed in 1995. <br /> The estimated cost for the reconstruction of the 5 alleys is $143,000. <br /> The city's assessment policy states that alley reconstruction will be assessed <br /> at 100% of the cost. <br /> The project timetable includes adopting the feasibility study at this meeting so <br /> that the engineer can proceed with survey work and plan for the neighborhood <br /> meetings. <br /> The proposed timing of the project and the financing of the project are within <br /> the city's capabilities. <br /> ATTACHMENTS: <br /> A Letter from city engineer dated 20 October 1994 <br /> B Alley feasibility study <br /> ACTION REQUESTED: <br /> Discuss the alley feasibility study <br /> Make a motion adopting the feasibility study and proceeding with five alleys <br /> in 1995 <br /> f�L�Y:::::::::::: �GY ::::..POLI�Y............�I..I�f <br />