Laserfiche WebLink
RESIDENTS IN NORTHOME AREA <br /> DECEMBER 14, 1994 <br /> PAGE FOUR <br /> 7. Will there be pavement placed between the edge of the alley and existing garages, <br /> and what is going to be done with the power poles? <br /> There will be a strip that will not have pavement adjacent to existing garages. The <br /> power poles will remain as they are, with bituminous placed by hand to provide a <br /> straight line of pavement. <br /> 8. When does the city anticipate reconstruction of the remaining alleys within the <br /> Northome area? <br /> The City currently expects to reconstruct the next group of alleys after both the <br /> Larpenteur Avenue project is completed in 1996 -1997, and a City street project is <br /> constructed in 1997 -1998. This schedule results in a 1998 -1999 construction <br /> period. <br /> 9. How will the inverted crown affect plowing of the alleys? <br /> The inverted crown will leave an inch or so of snow down the center of the alley. <br /> Mid winter thaws will also cause ice to collect in the center, but the improved <br /> grades will allow the water from the melted snow to run-off to the adjacent streets. <br /> CJB:pd <br /> o31- 0706.dec <br />