Laserfiche WebLink
MINUTES <br />CITY COUNCIL <br />SEPTEMBER 14, 2005 <br />we have seen in prior years. In 2005 the increase was less than I% due the <br />Sheriff's Department's retention efforts in connection with Arden Hills. <br />New Brighton Police offered Arden Hills police services at a very <br />competitive cost. The Sheriff chose to hold the line on the 2005 budget as <br />away of retaining Arden Hills. This benefited all of the contracting <br />communities but could not be duplicated for 2006, as was expected. We <br />are also picking up $16,400 for our share of another traffic car that will be <br />full-time in May of 2006. This is needed with the impact of Unweave the <br />Weave. The other contracting jurisdictions also have a need for this car. <br />We are paying 25% of the cost. <br />Impact = $63,638 <br />Fire Department operating budget is up $3,428 or 1.6%. Also you will <br />recall, poor investment performance in 2002-2003 required the City to <br />provide contributions beyond the $15,000 voluntary amount to fund <br />existing deficits in Che Relief Association. The stock market's general <br />improvement in 2004 and a change in Investment Advisors have resulted <br />in improvement in the fund balance. This results in a return to the agreed <br />upon support level of $15,000. <br />Impact = ($11,822) <br />2005 Fire Marshal personnel costs $ ].3,200 are expected to be $9,635 less <br />than budgeted due to Falcon Heights hiring the Fire Marshal directly. <br />During 2005 Che City of Little Canada filled its vacant Assistant Fire <br />Marshal and has included $10,000 in the 2006 budget to fund this position <br />(10 hrs. a week). <br />Impact = ($1,030) <br />Protective Inspections has increased to allow for a Housing Inspector. <br />Staff's exploring a cooperative venture with Roseville. Other options may <br />be available. <br />Impact = $25,000 <br />Street costs have added $12,500 for increased costs for seal coating. <br />Increasing oil prices have pushed the cost per yard of seal coat up by <br />18.6% over 2005 budgeted costs. Additionally in 2006 the streets <br />programmed for seal coating require 16.0% more in materials then those <br />budgeted for in 2005. Similar logic applies to the $10,000 increase in the <br />2006 crack filling costs compared to 2005. Street sweeping costs are also <br />expected to be $6,000 higher than 2005. For 2005 we proposed two <br />additional summer workers for the Public Works Department. Historically <br />the one temporary position was split between the Water and Sewer Funds. <br />With three temporary positions in total, one was to be charged each to the <br />Streets, Water, and Sewer Funds. This addition was made to address <br />concerns regarding deferred maintenance. In lieu of temporary workers <br />the City opted to use contract labor with Lino Lakes Correctional for these <br />5 <br />