Laserfiche WebLink
Planning Commission <br />June 26, 2008 <br />Page Two <br />3. The maximum standard driveway width allowed by ordinance is 24-feet and <br />this standard should be followed for all driveways unless documentation for <br />the need for a wider driveway is provided. <br />4. A concrete curb with depression inlets should be added around the filtration <br />swale median in the parking lot or a perimeter ribbon curb should be added <br />with parking stops. <br />5. There are nine regular parking stalls and 1 handicap parking stall that are <br />being eliminated that serve the north building that is remaining. The City <br />Planner should comment as to the adequacy of the overall parking provided <br />for the area. <br />Grading & Drainage Plan <br />1. The retaining wall along the east side of the new parking lot and building <br />exceeds 4 feet in height and therefore a retaining wall plan signed by a <br />licensed engineer must be provided. Details on the style, color, and type of <br />all retaining walls should be provided. <br />Utility Plan <br />1. The sewer service connection to the mainline system will be done within the <br />Rice Street right-of-way and therefore will require a permit from the County. <br />Documentation of permit approval must be provided prior to final approval of <br />the plans. A traffic control plan should also be provided for review and <br />approval for this work. <br />2. A tracer wire must be installed with the sanitary sewer service to allow for <br />accurate locating. The tracer wire should be terminated with a tracer wire <br />box to ensure it can be utilized in the future. <br />Details <br />1. If any sanitary manhole castings are used they should be ESS Brothers 301. <br />2. A detail with elevations should be provided for the StormTech chamber on <br />the north end of the new building. <br />3. The StormTech chamber system details indicate an infiltration pipe from the <br />bottom of the rock storage bed to the outlet structure below the invert of the <br />outlet structure outlet pipe. However the "design special" details for the outlet <br />structures do not indicate a bottom structure elevation below that of the outlet <br />pipe. Clarification should be made as to which detail is accurate and the <br />other details modified to match. <br />Storm Water Calculations <br />1. Drainage maps that are able to be scaled should be provided. <br />2. The time span for the calculations should be 0.00 - 24.00 hours. <br />3. The existing and post drainage areas should be the same for the overall site <br />that is reviewed. <br />Ltr-062606-PC <br />10062 Flanders Court NE, Blaine, MN 55449 -Phone: (763) 780-0450 -Fax: (763) 780-0452 <br />