The security system was budgeted at $25,000. The contract with Electro -Watchmen for <br />the card access readers and door contacts is for $12,286. The cameras cost $5658. That <br />yields a total of $17,944 for security. The original budget was $25,000 so we are in good <br />shape there. <br />Outlook <br />The actual budget using the actual costs staff knows is figured below: (Estimates are in <br />bold italics) <br />General Building Construction Costs: $3,219,220 <br />CM Fee $112,673 <br />Reimbursables $186,816 <br />Contingency $0 <br />Architect $188,324 <br />Civil Engineer $27,935 <br />Site Survey/Soil Borings $6,375 <br />SAC Charges $14,910 <br />Data Cabling & Connection Fees $8,418 <br />Asbestos Removal $9,621 <br />Underground Tank/Soil Contamination $12,900 <br />Furniture & Equipment $44,640 (to date) <br />Security System $17,944 <br />Total: $3,849,776 to date <br />The total above represents all known, expenditures to date. The final number is right in <br />line with the number when construction started so James Steele did a nice job of avoiding <br />major change orders and additions. <br />Outstanding items include a crane or forklift, trees, mezzanine shelving on the east side <br />of the building, and possible other equipment needs that arise. The construction portion <br />of the budget should be finished and now it is just the equipment and other needs that will <br />require possible additional expenditures. <br />