|
iffig0UnE
<br />inEarAME-
<br />M---N-ma.0-N-MR:MuMEN-,EMMEoNW-Affirltila
<br />ITEMiDESCRIRT1ONIMEOF-MR-W-MIELPAMMEMT2
<br />ORAFAMMER
<br />,WEITN1T-Ar9
<br />Iffiffi-E--ORIGINALM-ONTRA_IM=E:
<br />iffEEGTY,MOME-MINITIERICEM
<br />inamm-mrgagnvimmowa
<br />ramicitmomrowALI:5RI0BE
<br />ID:TA CiBATE1
<br />RE-EterffiEwMETOTAMERICO[
<br />82
<br />2663.601
<br />TRAFFIC CONTROL
<br />LS
<br />1,00
<br />$650.00
<br />0.00
<br />$0.00
<br />1,00
<br />$550,00
<br />63
<br />2573,602
<br />SILT FENCE, TYPE MACHINE SLICED
<br />LO
<br />480,00
<br />$2,26
<br />0,00
<br />$0,00
<br />390,00
<br />$677.60
<br />64
<br />2673.620
<br />SEDIMENT REMOVAL. BACKHOE
<br />HOURS
<br />10.00
<br />$100.00
<br />$90,00
<br />0,00
<br />0,00
<br />$0,00
<br />$0,00
<br />2,50
<br />9.00
<br />8250,00
<br />$810.00
<br />55
<br />2673,630
<br />INLET PROTECTION (WIMCO)
<br />EACH
<br />11.00
<br />66
<br />2673.630
<br />INLET PROTECTION (STRUCTURE W/O CASTING)
<br />EACH
<br />11,00
<br />59600
<br />0.00
<br />$0,00
<br />7.00
<br />$830.00
<br />67
<br />2573,602
<br />INLET SEDIMENT REMOVAL
<br />EACH
<br />15.00
<br />$30.00
<br />0.00
<br />$0.00
<br />14.00
<br />$420.00
<br />68
<br />2873,802
<br />TEMPORARY ROCK CONSTRUCTION ENTRANCE
<br />EACH
<br />1,00
<br />$400,00
<br />0.00
<br />50,00
<br />1.00
<br />$400.00
<br />69
<br />2673.607
<br />ROADWAY ROCK CHECK DAM
<br />CY
<br />60,00
<br />$30.00
<br />0,00
<br />$0,00
<br />24,10
<br />$843,60
<br />60
<br />2576.632
<br />FERTILIZER (TYPE 24-12-24)
<br />LES
<br />276.00
<br />$0,60
<br />0,00
<br />$0.00
<br />0,00
<br />$0.00
<br />61
<br />2675,804
<br />SEEDING (TYPE 270)
<br />SY
<br />2,130,00
<br />81.00
<br />35,00
<br />$36.00
<br />2,119,00
<br />$2,119,00
<br />62
<br />2575,604
<br />SEEDING (TYPE WET FORBES)
<br />SY
<br />2 260,00
<br />$1.26
<br />0,00
<br />$0,00
<br />1,879,00
<br />52045,75
<br />63
<br />SPEC
<br />GRADATION TEST
<br />EACH
<br />2.00
<br />$06.00
<br />0,00 '
<br />50.00
<br />3,00
<br />6286,00
<br />64
<br />SPEC
<br />PROCTOR TEST
<br />EACH
<br />4.00
<br />696.00
<br />0,00
<br />$0,00
<br />6,00
<br />$476,00
<br />66
<br />SPEC
<br />[DENSITY TEST
<br />EACH
<br />11,00
<br />$65.00
<br />$66,00
<br />0,00
<br />0,00
<br />$0,00
<br />Om
<br />5,00
<br />7,00
<br />8520.00
<br />$466.00
<br />68
<br />SPEC
<br />NUCLEAR BITUMINOUS [DENSITY
<br />EACH
<br />6,00
<br />87
<br />SPEC
<br />AIR VOIDS TEST
<br />EACH
<br />4.00
<br />$160,00
<br />0,00
<br />$0.00
<br />2,00
<br />$300,00
<br />68
<br />SPEC
<br />CONCRETE TESTING, CYLINDERS (SET 0123)
<br />EACH
<br />4,00
<br />$220.00
<br />0,00
<br />$0,00
<br />1.00
<br />0220.00
<br />69
<br />SPEC
<br />EXTRACTION/GRADATION
<br />EACH
<br />4,00
<br />$176.00
<br />0.00
<br />$0.00
<br />2,00
<br />6360.00
<br />80.00
<br />$0.00
<br />060,18
<br />6,00
<br />$9,217,54
<br />$26,00
<br />10
<br />2232,601
<br />MILL BITUMINOUS PAVEMENT
<br />SY
<br />10.00
<br />$6.00
<br />0.00
<br />SCHEDULE 1.0 - JACKSON STREET . TOTAL 64,693.76 6231,673.81
<br />SCHEDULE 2,0 - BRYAN STREET
<br />1
<br />2021.601
<br />MOBILIZATION
<br />LS
<br />1,00
<br />$2,300,00
<br />0.00
<br />$0.00
<br />1,00
<br />$2,300,00
<br />2
<br />2101.602
<br />CLEARING
<br />TREE
<br />4.00
<br />8180,00
<br />0,00
<br />80,00
<br />7.00
<br />81,060,00
<br />3
<br />2101,607
<br />GRUBBING
<br />TREE
<br />4,00
<br />860.00
<br />0,00
<br />$0.00
<br />9,00
<br />5460,00
<br />4
<br />2104.601
<br />REMOVE LANDSCAPE ROCK EDGER
<br />LF
<br />3560
<br />$3.00
<br />0.00
<br />$0.00
<br />• 36,00
<br />$105,00
<br />6
<br />2104,601
<br />REMOVE CONCRETE CURB AND GUTTER
<br />LF
<br />110,00
<br />$3.00
<br />0,00
<br />60.00
<br />67.00
<br />$201,00
<br />6
<br />2104.600
<br />REMOVE CONCRETE SIDEWALK
<br />Sr
<br />10,00
<br />$2.00
<br />0.00
<br />$0,00
<br />20.80
<br />$60,00
<br />$107,20
<br />62,510,00
<br />7
<br />2104.606
<br />REMOVE CONCRETE PAVEMENT
<br />SY
<br />115.00
<br />$3,35
<br />0.00
<br />0,00
<br />$0,00
<br />$0.00
<br />32,00
<br />1,400.00
<br />8
<br />2104.606
<br />REMOVE BITUMINOUS PAVEMENT .
<br />SY
<br />1,460.00
<br />$1.80
<br />9
<br />2104.606
<br />REMOVE CONCRETE RETAINING WALL
<br />SY
<br />120,00
<br />$4,00
<br />0,00
<br />$0.00
<br />30.00
<br />$120,00
<br />10
<br />2104,511
<br />SAW CUT CONCRETE (FULL DEPTH)
<br />LF
<br />80,00
<br />$3.00
<br />0.00
<br />$0,00
<br />12,00
<br />' 636,00
<br />11
<br />2104.613
<br />SAW CUT BITUMINOUS (FULL DEPTH)
<br />LF
<br />126,00
<br />$2.00
<br />0.00
<br />$0,00
<br />441.00
<br />$862,00
<br />12
<br />2104,623
<br />SALVAGE MAILBOX
<br />EACH
<br />3,00
<br />20.00
<br />0.00
<br />Km
<br />$0.00
<br />4,00
<br />1,00
<br />0600
<br />$200.00
<br />13
<br />2104,823
<br />SALVAGE LIGHT POLE
<br />EACH
<br />2,00
<br />6200.00
<br />0,00
<br />14
<br />2106.601
<br />COMMON EXCAVATION (P)
<br />CY
<br />813,38
<br />610.00
<br />0.00
<br />$0,00
<br />813,38
<br />$8,133,80
<br />18
<br />2105.001
<br />POND EXCAVATION (RAINWATER GARDEN)
<br />CY
<br />45,00
<br />$14.00
<br />0.00
<br />$0,00
<br />20,00
<br />$280.00
<br />10
<br />2108.625
<br />TOPSOIL BORROW
<br />CY
<br />140,00
<br />' 60.01
<br />0.00
<br />$0.00
<br />92,00
<br />$0.92
<br />17
<br />2131,602
<br />CALCIUM CHLORIDE
<br />GAL
<br />500.00
<br />$1.30
<br />0.00
<br />$0,00
<br />0,00
<br />$0.00
<br />18
<br />221 .601
<br />AGGREGATE BASE CLASS 6 ROAD
<br />TON
<br />040,00
<br />'.8.00
<br />0,00
<br />80.00
<br />$0.00
<br />060,18
<br />6,00
<br />$9,217,54
<br />$26,00
<br />10
<br />2232,601
<br />MILL BITUMINOUS PAVEMENT
<br />SY
<br />10.00
<br />$6.00
<br />0.00
<br />20
<br />23600601
<br />TYPE MV4 WEAR COURSE MIXTURE
<br />TON
<br />160.00
<br />$67.60
<br />0.00
<br />$0,00
<br />04,70
<br />$6,392.26
<br />21
<br />2360.501
<br />TYPE MV4 WEAR COURSE MIXTURE (DRIVEWAY)
<br />TON
<br />40.00
<br />$80,00
<br />0.00
<br />$0,00
<br />30,10
<br />83,128.00
<br />22
<br />2360.602
<br />TYPE LV3 NON WEARING COURSE MIXTURE (BASE)
<br />TON
<br />190,00
<br />$56.80
<br />0,00
<br />80,00
<br />172.00
<br />$6769,60
<br />23
<br />2503,641
<br />12" RC PIPE SEWER DES 3008, CLV
<br />Lr
<br />31,00
<br />$23.00
<br />0,00
<br />80,00
<br />31,00
<br />$713,00
<br />24
<br />2603,541
<br />16" RC PIPE SEWER DES 3008 CLV
<br />LE
<br />122,00
<br />$24,00
<br />0.00
<br />80,00
<br />$0.00
<br />122,00
<br />1,00
<br />$2628.00
<br />$200,00
<br />26
<br />2604.602
<br />ADJUST VALVE BOX
<br />EACH
<br />1,00
<br />$200,00
<br />0,00
<br />20
<br />2504,002
<br />ADJUST CURS 8005 BOX
<br />EACH
<br />2.00
<br />$100.00
<br />0,00
<br />$0.00
<br />0,00
<br />$0,00
<br />27
<br />2508,502
<br />CONST DRAINAGE STRUCTURE DESIGN SPECIAL 24")(36"
<br />EACH
<br />1,00
<br />$1,200.00
<br />0.00
<br />$0,00
<br />1.00
<br />$1,200.00
<br />28
<br />2606.602
<br />CONST DRAINAGE STRUCTURE DESIGN 48-4020
<br />EACH
<br />2,00
<br />61,660.00
<br />0.00
<br />$0.00
<br />2,00
<br />$3,300,00
<br />20
<br />2606,622
<br />ADJUST FRAME AND RING CASTING
<br />EACH
<br />1,00
<br />$475,00
<br />0,00
<br />$0.00
<br />1,00
<br />$476,00
<br />30
<br />262 .501
<br />4" CONCRETE SIDEWALK
<br />SF
<br />10.00
<br />63,16
<br />0,00
<br />$0.00
<br />11,00
<br />$34.85
<br />31
<br />2531,601
<br />CONCRETE CURB & GUTTER DESIGN 8016
<br />LE
<br />86.00
<br />09,06
<br />0.00
<br />$0.00
<br />60,00
<br />$643.00
<br />32
<br />2631.501
<br />CONCRETE CURE & GUTTER DESIGN SURMOUNTABLE
<br />LF
<br />930.00
<br />$0.70
<br />0,00
<br />$0.00
<br />008.00
<br />$7,890.60
<br />33
<br />2631.607
<br />CONCRETE DRIVEWAY APRON (8" THICK)
<br />SY
<br />100.00
<br />$36.46
<br />0.00
<br />$0.00
<br />104,00
<br />$3,790,80
<br />34
<br />2531,607
<br />CONCRETE DRIVEWAY PAVEMENT (6" THICK)
<br />SY
<br />96,00
<br />$36,46
<br />0.00
<br />$0,00
<br />27.90
<br />$1,016.98
<br />36
<br />2640.602
<br />INSTALL SALVAGED MAILBOX
<br />EACH
<br />3,00
<br />$58.00
<br />0.00
<br />$0,00
<br />4,00
<br />$232,00
<br />36
<br />2640,003
<br />LANDSCAPE EDGER, STEEL
<br />LF
<br />226,00
<br />85,00
<br />0,00
<br />$0.00
<br />46,00
<br />622660
<br />37
<br />2846,605
<br />INSTALL SALVAGED LIGHT POLE
<br />EACH
<br />2.00
<br />$1,000.00
<br />0,00
<br />$0,00
<br />1,00
<br />$1,000.00
<br />38
<br />2663.601
<br />TRAFFIC CONTROL
<br />LS
<br />1,00
<br />$226,00
<br />0.00
<br />$0,00
<br />1.00
<br />$226,00
<br />39
<br />2671,644
<br />TRANSPLANT SHRUB
<br />EACH
<br />0,00
<br />$00,00
<br />0,00
<br />80.00
<br />6,00
<br />$840,00
<br />40
<br />2673.602
<br />SILT FENCE TYPE MACHINE SLICED
<br />LF
<br />170.00
<br />$2.26
<br />0,00
<br />$0.00
<br />185.00
<br />$416,26
<br />41
<br />2673,620
<br />SEDIMENT REMOVAL BACKHOE
<br />HOURS
<br />5,00
<br />$100.00
<br />0,00
<br />$0.00
<br />0.00
<br />$0.00
<br />2
<br />
|