|
ramffima
<br />M .-M-MUMFAMMORMMMLUMMME
<br />mirtia-nikiitommammtrammtrommummoom
<br />PRICiw$
<br />ifflMworammr-m-auelT _
<br />;M_,_MMT_811U_SIOD1WAMME.
<br />MRAMMUITAIMMATOOMMI
<br />MaratYNEEMLIUDOPIlrail
<br />42
<br />2573.530
<br />INLET PROTECTION (WIMCO)
<br />EACH
<br />3.00
<br />090,00
<br />0,00
<br />00.00
<br />3,00
<br />$270.00
<br />43
<br />2573,630
<br />INLET PROTECTION (STRUCTURE W/O CASTING)
<br />EACH
<br />3.00
<br />$90.00
<br />0,00
<br />$0,00
<br />3,00
<br />$270.00
<br />44
<br />2673.602
<br />INLET SEDIMENT REMOVAL
<br />EACH
<br />6.00
<br />$30,00
<br />0.00
<br />$0.00
<br />8.00
<br />$180.00
<br />48
<br />2673,607
<br />ROADWAY ROCK CHECK DAM
<br />CY
<br />30,00
<br />$37.00
<br />0.00
<br />$0.00
<br />0.00
<br />$0.00
<br />48
<br />2576,513
<br />MULCH MATERIAL TYPE SPECIAL
<br />CY
<br />10,00
<br />650.00
<br />0,00
<br />00.00
<br />10.00
<br />6600,00
<br />47
<br />2575,532
<br />FERTILIZER (TYPE 24-12-24)
<br />LBS
<br />70,00
<br />$0,50
<br />0.00
<br />$0,00
<br />0,00
<br />$0,00
<br />40
<br />2675,850
<br />COMPOST GRADE 2
<br />CY
<br />20.00
<br />$18.00
<br />0.00
<br />$0,00
<br />10,00
<br />$180.00
<br />49
<br />2675.004
<br />SEEDING (TYPE 270)
<br />SY
<br />1,010,00
<br />61.00
<br />0,00
<br />$0,00
<br />713.00
<br />0713,00
<br />60
<br />2676,807
<br />LANDSCAPE ROCK
<br />CY
<br />10,00
<br />$46,00
<br />0,00
<br />$0,00
<br />0,00
<br />$0.00
<br />51
<br />SPEC
<br />GRADATION TEST
<br />EACH
<br />2,00
<br />095,00
<br />0,00
<br />$0.00
<br />1,00
<br />$96,00
<br />52
<br />SPEC
<br />PROCTOR TEST
<br />EACH
<br />4,00
<br />$95.00
<br />0.00
<br />00.00
<br />1.00
<br />695.00
<br />83
<br />SPEc
<br />DENSITY TEST
<br />EACH
<br />6.00
<br />$65,00
<br />0.00
<br />60.00
<br />4,00
<br />$280.00
<br />54
<br />SPEC
<br />NUCLEAR BITUMINOUS DENSITY
<br />EACH
<br />6,00
<br />065,00
<br />0.00
<br />60.00
<br />5,00
<br />$326,00
<br />66
<br />SPEC
<br />AIR VOIDS TEST
<br />EACH
<br />4.00
<br />$150.00
<br />0,00
<br />$0.00
<br />1,00
<br />6160.00
<br />66
<br />80E0
<br />CONCRETE TESTING, CYLINDERS (SET OF 3)
<br />EXTRACTION/GRADATION
<br />EACH
<br />EACH
<br />2,00
<br />4,00
<br />$220,00
<br />$175,00
<br />0,00
<br />0,00
<br />60,00
<br />$0,00
<br />2,00
<br />1,00
<br />$440,00
<br />$175,00
<br />67
<br />SPEC
<br />0.00
<br />.
<br />$0.00
<br />60,00
<br />1,823,00
<br />372,00
<br />$27,801.90
<br />$3.72
<br />17
<br />2105,526
<br />TOPSOIL. BORROW
<br />CY
<br />285,00
<br />$0,01
<br />SCHEDULE 2.0 - BRYAN AVENUE - TOTAL $0.00 $73,630,66
<br />SCHEDULE 3.0 - IONA LANE
<br />1
<br />2021 601
<br />MOBILIZATION
<br />LS
<br />1.00
<br />$11,400.00
<br />0,00
<br />$0.00
<br />1.00
<br />$11,400.00
<br />2
<br />2101,502
<br />CLEARING
<br />TREE
<br />2.00
<br />$160,00
<br />0.00
<br />$0.00
<br />1.00
<br />$150.00
<br />3
<br />2101,607
<br />GRUBBING
<br />TREE
<br />2.00
<br />$60,00
<br />0.00
<br />$0.00
<br />, 2,00
<br />$100.00
<br />4
<br />2104.601
<br />REMOVE CONCRETE CURB AND GUTTER
<br />LF
<br />35,00
<br />$3.00
<br />0,00
<br />$0,00
<br />42,00
<br />$126.00
<br />5
<br />2104,601
<br />REMOVE SEWER PIPE (STORM)
<br />LO
<br />154,00
<br />0600
<br />0,00
<br />$0,00
<br />164.00
<br />$770.00
<br />6
<br />2104.801
<br />REMOVE LANDSCAPE EDGER
<br />LO
<br />86,00
<br />$3,00
<br />0.00
<br />$0,00
<br />30.00
<br />$114.00
<br />7
<br />2104.605
<br />REMOVE CONCRETE PAVEMENT
<br />SY
<br />140,00
<br />$3.00
<br />0,00
<br />$0,00
<br />81.00
<br />$243,00
<br />8
<br />2104.605
<br />REMOVE BITUMINOUS PAVEMENT
<br />. 8Y
<br />3,880.00
<br />$1.80
<br />0.00
<br />$0.00
<br />3,680.00
<br />66624.00
<br />9
<br />2104,609
<br />REMOVE DRAINAGE STRUCTURE
<br />EACH
<br />3.00
<br />$280.00
<br />0,00
<br />$0.00
<br />3.00
<br />$750,00
<br />10
<br />2104,509
<br />REMOVE HYDRANT AND VALVE
<br />EACH
<br />1,00
<br />0376,00
<br />$3.00
<br />0,00
<br />0,00
<br />60.00
<br />$0,00
<br />1,00
<br />105,00
<br />$376.00
<br />$315,00
<br />11
<br />2104,511
<br />SAW CUT CONCRETE (FULL DEPTH)
<br />LF
<br />146.00
<br />12
<br />2104,613
<br />SAW CUT BITUMINOUS (FULL DEPTH)
<br />LF
<br />90.00
<br />$2,26
<br />0.00
<br />$0.00
<br />107.00
<br />6240.76
<br />13
<br />2104,523
<br />SALVAGE MAILBOX
<br />EACH
<br />14.00
<br />$20.00
<br />0.00
<br />$0.00
<br />14.00
<br />$280.00
<br />14
<br />2106,601
<br />COMMON EXCAVATION (P)
<br />CY
<br />1,341.12
<br />$10.00
<br />176,00
<br />61,750.00
<br />1,206.00
<br />612,050.00
<br />15
<br />2105,501
<br />POND EXCAVATION (RAINWATER GARDEN)
<br />CY
<br />22,00
<br />$22.00
<br />0,00
<br />$0.00
<br />12,00
<br />$264,00
<br />16
<br />2106,622
<br />SELECT GRANULAR BORROW (CV)
<br />CY
<br />1,300.00
<br />$15,30
<br />0.00
<br />.
<br />$0.00
<br />60,00
<br />1,823,00
<br />372,00
<br />$27,801.90
<br />$3.72
<br />17
<br />2105,526
<br />TOPSOIL. BORROW
<br />CY
<br />285,00
<br />$0,01
<br />0.00
<br />18
<br />2105.604
<br />GEOTEXTILE FABRIC
<br />SY
<br />3,720.00
<br />$2.00
<br />0,00
<br />$0,00
<br />3,207,00
<br />66,414.00
<br />19
<br />2123.610
<br />EXPLORATORY DIGGING
<br />HOUR
<br />12,00
<br />$250.00
<br />0.00
<br />90.00
<br />1,78
<br />6437.50
<br />20
<br />2131,802
<br />CALCIUM CHLORIDE
<br />GAL
<br />1,000.00
<br />$1.30
<br />0.00
<br />$0,00
<br />0,00
<br />$0,00
<br />21
<br />2211.601
<br />AGGREGATE BASE CLASS 5, ROAD
<br />TON
<br />1,800.00
<br />$0,80
<br />0,00
<br />60.00
<br />1,652.48
<br />$14,903,81
<br />22
<br />2232,501
<br />MILL BITUMINOUS PAVEMENT
<br />SY
<br />35,00
<br />$5.00
<br />0,00
<br />60,00
<br />13.00
<br />$65,00
<br />23
<br />2350.801
<br />TYPE MV4 WEAR COURSE MIXTURE
<br />TON
<br />290,00
<br />667,50
<br />0,00
<br />$0.00
<br />220.80
<br />814,004.00
<br />24
<br />2360.501
<br />TYPE MV4 WEAR COURSE MIXTURE (DRIVEWAY)
<br />TON
<br />40.00
<br />680.00
<br />0.00
<br />90.00
<br />24.57
<br />$1,985.80
<br />26
<br />2360.602
<br />TYPE LV3 NON WEARING COURSE MIXTURE (BASE)
<br />TON
<br />400,00
<br />$56,80
<br />0.00
<br />$0.00
<br />363,62
<br />820,663.82
<br />26
<br />2602,641
<br />4" 0000 06 PIPE DRAIN W/SOCK
<br />LP
<br />2,276,00
<br />$2,26.
<br />$24,00
<br />$26.00
<br />0,00
<br />0,00
<br />0,00
<br />$0.00
<br />$0.00
<br />$0,00
<br />1,808.00
<br />92,00
<br />61.00
<br />64,063.80
<br />62,208.00
<br />$1,586,00
<br />27
<br />2603.641
<br />16" RC PIPE SEWER DES 3006, CLV
<br />18" RC PIPE SEWER DES 3006, OLIII
<br />LO
<br />LF
<br />92.00
<br />81.00
<br />28
<br />2503,641
<br />29
<br />2603,602
<br />CONNECT To EXISTING STORM SEWER
<br />EACH
<br />2,00
<br />$550,00
<br />0,00
<br />$0,00
<br />2,00
<br />$1,100.00
<br />30
<br />2503.602
<br />CONNECT TO EXISTING STORM STRUCTURE
<br />EACH
<br />2,00
<br />$860,00
<br />0,00
<br />$0.00
<br />3,00
<br />02,560.00
<br />31
<br />2604,602
<br />ADJUST VALVE BOX
<br />EACH
<br />2.00
<br />$200.00
<br />0.00
<br />$0.00
<br />2.00
<br />$400.00
<br />32
<br />2604.602
<br />ADJUST CURB STOP BOX
<br />EACH
<br />2,00
<br />$100,00
<br />0,00
<br />$0,00
<br />0.00
<br />$0,00
<br />33
<br />2504.602
<br />INSTALL HYDRANT AND VALVE
<br />EACH
<br />1,00
<br />86,000,00
<br />0,00
<br />$0.00
<br />$0,00
<br />1,00
<br />0.00
<br />*5,000.50
<br />$0,00
<br />34
<br />2804,892
<br />6" GATE VALVE AND BOX
<br />EACH
<br />2.00
<br />$2 400,00
<br />0,00
<br />35
<br />2608,602
<br />CONST DRAINAGE STRUCTURE DESIGN SPECIAL 24"X36"
<br />EACH
<br />2.00
<br />$1,200,00
<br />060
<br />$0.00
<br />2,00
<br />$2,400,00
<br />88
<br />2506.502
<br />CONS' DRAINAGE STRUCTURE DESIGN 48.4020
<br />EACH
<br />1.00
<br />$1,860.00
<br />0,00
<br />$0,00
<br />1,00
<br />$1,650,00
<br />37
<br />2606,622
<br />ADJUST FRAME AND RING CASTING
<br />EACH
<br />3,00
<br />9476,00
<br />2,00
<br />$960.00
<br />4.00
<br />61,900.00
<br />38
<br />2608,602
<br />RECONSTRUCT DRAINAGE STRUCTURE
<br />EACH
<br />LF
<br />2.00
<br />2,086.00
<br />61,060,00
<br />69.06
<br />0,00
<br />0,00
<br />60,00
<br />$0.00
<br />2,00
<br />2,045.00
<br />$2,100,00
<br />$16607,26
<br />39
<br />2631,501
<br />CONCRETE CURD & GUTTER DESIGN 6610
<br />40
<br />2631,607
<br />CONCRETE DRIVEWAY APRON (6" THICK)
<br />SY
<br />140.00
<br />638,48
<br />0.00
<br />60,00
<br />124.00
<br />64,519.80
<br />41
<br />2531.507
<br />CONCRETE DRIVEWAY APRON (8" THICK)
<br />SY
<br />13.00
<br />$47,70
<br />0,00
<br />00,00
<br />0.00
<br />80,00
<br />42
<br />2631,507
<br />CONCRETE DRIVEWAY PAVEMENT (8" THICK)
<br />8Y
<br />145,00
<br />$36.46
<br />0,00
<br />$0.00
<br />95.00
<br />63,462.75
<br />43
<br />2640.602
<br />INSTALL SALVAGED MAILBOX
<br />EACH
<br />14.00
<br />$88.00
<br />0,00
<br />$0.00
<br />14.00
<br />$812.00
<br />
|