Laserfiche WebLink
Lmm-MME <br />MM. Map% <br />ITE9443ES-CRIF_TICREIMMEMMHMMMMEIMMMR0 <br />MANVAVAR <br />IMMIJNITTM9 <br />NA IrM:021ILIMM'S <br />toota---mwomagg[gcufflommm <br />PRIGE <br />RRIGEE <br />MITATOIMMTP-ACIMAiNi! <br />crprfi-ZJa.0TAt0ERIcEdi <br />44 <br />2640,603 <br />LANDSCAPE EDGER, STEEL <br />LF <br />110,00 <br />$6.00 <br />0,00 <br />60.00 <br />30.00 <br />$160.00 <br />46 <br />2640,603 <br />LANDSCAPE EDGER <br />LF <br />96.00 <br />94.00 <br />0.00 <br />$0.00 <br />soo <br />$0,00 <br />46 <br />2640618 <br />INSTALL ROCK RETAINING WALL <br />SF <br />285,00 <br />$28,00 <br />soo <br />60.00 <br />136,00 <br />$3508,00 <br />47 <br />2503601 <br />TRAFFIC CONTROL <br />LS <br />1,00 <br />9275,00 <br />0,00 <br />$0,00 <br />1.00 <br />6275,00 <br />48 <br />2673.602 <br />SILT FENCE, TYPE MACHINE SLICED <br />LF <br />60,00 <br />62.25 <br />0,00 <br />60.00 <br />70.00 <br />6157,60 <br />49 <br />2673,620 <br />SEDIMENT REMOVAL BACKHOE <br />HOURS <br />6.00 <br />$100,00 <br />0,00 <br />60,00 <br />0,00 <br />60.00 <br />50 <br />2573.630 <br />INLET PROTECTION (WIMCO) <br />EACH <br />660 <br />590,00 <br />0.00 <br />90,00 <br />0.00 <br />6000 <br />81 <br />2673,630 <br />INLET PROTECTION (STRUCTURE W/O CASTING) <br />EACH <br />6.00 <br />$90.00 <br />0,00 <br />60.00 <br />5,00 <br />0450.00 <br />62 <br />2673.602 <br />INLET SEDIMENT REMOVAL <br />EACH <br />6.00 <br />$30,00 <br />0.00 <br />$0.00 <br />6.00 <br />$100.00 <br />63 <br />2673,602 <br />TEMPORARY ROCK CONSTRUCTION ENTRANCE <br />EACH <br />1,00 <br />9400,00 <br />$37,00 <br />000 <br />0,00 <br />$0,00 <br />60.00 <br />0,00 <br />2,40 <br />$0,00 <br />$68,00 <br />64 <br />2673.607 <br />ROADWAY 11001( CHECK DAM <br />OY <br />3000 <br />86 <br />2575,613 <br />MULCH MATERIAL TYPE SPECIAL <br />CY <br />6.00 <br />050.00 <br />0.00 <br />60,00 <br />2,00 <br />6100.00 <br />66 <br />2676.632 <br />FERTILIZER (TYPE 24-12-24) <br />LES <br />180,00 <br />90,60 <br />0.00 <br />60,00 <br />0.00 <br />$0.00 <br />57 <br />2678.660 <br />COMPOST GRADE 2 <br />CY <br />12,00 <br />015,00 <br />0,00 <br />moo <br />6,00 <br />800,00 <br />68 <br />2576,604 <br />SEEDING (TYPE 270) <br />SY <br />2660.00 <br />$1.00 <br />1465.00 <br />61,466.00 <br />3,463.00 <br />63,463.00 <br />89 <br />2575,007 <br />LANDSCAPE ROCK <br />OY <br />3,00 <br />845.00 <br />0,90 <br />$0.00 <br />0,00 <br />60.00 <br />00 <br />9900 <br />GRADATION TEST <br />EACH <br />2.00 <br />695.00 <br />0.00 <br />00,00 <br />1,00 <br />696,00 <br />61 <br />SPEC <br />PROCTOR TEST <br />EACH <br />4.00 <br />$95.00 <br />0.00 <br />Moo <br />2.00 <br />6100.00 <br />62 <br />SPECS <br />DENSITY TEST <br />EACH <br />8,00 <br />$68.00 <br />0,00 <br />90.00 <br />6,00 <br />$328,00 <br />63 <br />SPEC <br />NUCLEAR BITUMINOUS DENSITY <br />9Acll <br />660 <br />605.00 <br />0,00 <br />$0.00 <br />6,00 <br />8390.00 <br />64 <br />5900 <br />AIR VOIDS TEST <br />EACH <br />4,00 <br />$150.00 <br />000 <br />$0.00 <br />2,00 <br />$300,00 <br />65 <br />SPED <br />CONCRETE TESTING, CYLINDERS (SET OF 3) <br />EACH <br />4,00 <br />$22600 <br />0.00 <br />$0.00 <br />2,00 <br />6440.00 <br />66 <br />SPEO <br />EXTRACTION/GRADATION <br />EACH <br />4,00 <br />0178.00 <br />so <br />OM <br />2.00 <br />9250,00 <br />SPEC <br />EXTRAcTioN/GRADATIoN <br />EACH <br />4.00 <br />$176.00 <br />0.00 <br />$0.00 <br />2,00 <br />Woo) <br />SCHEDULE 3.0 - IONA LANE - TOTAL 64,105.00 6104,122.48 <br />SCHEDULE 4.0 - PARK STREET <br />1 <br />2021.601 <br />MOBILIZATION <br />LS <br />1,00 <br />62200.00 <br />0,00 <br />$0.00 <br />160 <br />$2.200,00 <br />2 <br />2104,506 <br />REMOVE BITUMINOUS PAVEMENT <br />SY <br />1,600,00 <br />01.80 <br />600 <br />90.00 <br />1,500.00 <br />62,700,00 <br />3 <br />2104.623 <br />SALVAGE SIGN <br />EACH <br />1,00 <br />615,00 <br />0,00 <br />00.00 <br />0.00 <br />Moo <br />4 <br />2105,501 <br />COMMON EXCAVATION (P) <br />CY <br />440,00 <br />612.00 <br />0,00 <br />$0.00 <br />626,00 <br />96300,00 <br />6 <br />2105625 <br />TOPSOIL BORROW <br />CY <br />28600 <br />$0.01 <br />0,00 <br />60.00 <br />0,00 <br />$060 <br />6 <br />2211.501 <br />AGGREGATE BASE CLASS 5, ROAD <br />TON <br />250.00 <br />$0,50 <br />600 <br />$0,00 <br />448.84 <br />$4,305.08 <br />7 <br />2232,501 <br />MILL BITUMINOUS PAVEMENT <br />sY <br />130.00 <br />65,00 <br />0.00 <br />00.00 <br />17.00 <br />$85.00 <br />8 <br />2360,501 <br />TYPE MV4 WEAR COURSE MIXTURE <br />TON <br />200,00 <br />967,60 <br />0,00 <br />9060 <br />178,36 <br />$12,039,30 <br />0 <br />2356602 <br />TYPE LV3 NON WEARING COURSE MIXTURE (BASE) <br />TON <br />EACH <br />260,00 <br />600 <br />056,80 <br />0475.00 <br />0,00 <br />0,00 ' <br />00.00 <br />90.00 <br />235,30 <br />3,00 <br />$13,365,04 <br />$1,425.00 <br />10 <br />2506.622 . <br />ADJUST FRAME AND RING CASTING <br />11 <br />2663.601 <br />TRAFFIC CONTROL <br />LS <br />1.00 <br />$125,00 <br />0.00 <br />Moo <br />1,00 <br />812000 <br />12 <br />2564,802 <br />INSTALL SALVAGED SIGN <br />EACH <br />1,00 <br />$65.00 <br />0,00 <br />90.00 <br />0,00 <br />$0.00 <br />13 <br />2573,502 <br />SILT FENCE, TYPE MACHINE SLICED <br />LF <br />200,00 <br />$2,25 <br />0,00 <br />$0,00 <br />0,00 <br />$0,00 <br />14 <br />2573,630 <br />INLET PROTECTION (WIMCO) <br />EACH <br />2.00 <br />300.00 <br />0.00 <br />60,00 <br />0.00 <br />$0,90 <br />16 <br />2673,602 <br />TEMPORARY ROCK CONSTRUCTION ENTRANCE <br />EACH <br />1,00 <br />$400,00 <br />0,00 <br />$0,00 <br />0.00 <br />$0.00 <br />10 <br />2573,607 <br />ROADWAY ROCK CHECK DAM <br />CY <br />10.00 <br />937.00 <br />0.00 <br />00,00 <br />0,00 <br />60,00 <br />17 <br />2876.532 <br />FERTILIZER (TYPE 24-12-24) <br />LBS <br />110,00 <br />$0,50 <br />0.00 <br />$0.00 <br />0.00 <br />$0.00 <br />18 <br />2575,604 <br />SEEDING (TYPE 270) <br />SY <br />1,570.00 <br />01,00 <br />0.00 <br />$0.00 <br />0,00 <br />$0.00 <br />19 <br />SPEC <br />GRADATION TEST <br />EACH <br />1,00 <br />$95.00 <br />0,00 <br />$0.00 <br />1.00 <br />$95,00 <br />20 <br />SPEC <br />PROCTOR TEST <br />EACH <br />2,00 <br />855.00 <br />0.90 <br />80,00 <br />0,00 <br />$0.00 <br />21 <br />SPEC <br />DENSITY TEST <br />0A0id <br />4,00 <br />60600 <br />0,00 <br />$0,00 <br />2,00 <br />0100.00 <br />22 <br />SPEC <br />NUCLEAR BITUMINOUS DENSITY <br />EACH <br />4,00 <br />Wm <br />0,00 <br />Moo <br />4,00 <br />4260,00 <br />23 <br />SPEC <br />AIR VOIDS TEST <br />EACH <br />6.00 <br />8150.00 <br />0,00 <br />$0,00 <br />2.00 <br />$300.00 <br />24 <br />SPEC <br />EXTRAcTioN/GRADATIoN <br />EACH <br />4.00 <br />$176.00 <br />0.00 <br />$0.00 <br />2,00 <br />Woo) <br />SCHEDULE 4.0 - PARK STREET - TOTAL 90,00 94650,32 <br />SCHEDULE 6.0 - FIRE HALL PARKING LOT <br />1 <br />2021.601 <br />MOBILIZATION <br />LS <br />1,00 <br />62,60600 <br />0,00 <br />00,00 <br />1,00 <br />02600,00 <br />2 <br />2104.505 <br />REMOVE BITUMINOUS PAVEMENT <br />SY <br />190.00 <br />$1.00 <br />0.00 <br />$0.00 <br />180,00 <br />$361,00 <br />3 <br />2104,506 <br />REMOVE RETAINING WALL <br />SY <br />30,00 <br />05.00 <br />0,00 <br />$0.00 <br />16.00 <br />Woo <br />4 <br />2104,521 <br />SALVAGE FENCE <br />LF <br />45.00 <br />Woo <br />0.00 <br />00.00 <br />65.00 <br />$275.00 <br />6 <br />2105.601 <br />COMMON EXCAVATION (P) <br />CY <br />26,00 <br />624,00 <br />0,00 <br />$0,00 <br />26,00 <br />6600,00 <br />6 <br />2105,525 <br />TOPSOIL BORROW <br />CY <br />2600 <br />$0,01 <br />0,00 <br />$0,00 <br />26.00 <br />$0.25 <br />7 <br />2211,601 <br />AGGREGATE BASE CLASS 5, ROAD <br />MILL EITUMINoUe PAVEMENT <br />TON <br />SY <br />120,00 <br />60,00 <br />$8,00 <br />66.00 <br />0,00 <br />0,00 <br />90,00 <br />90,00 <br />39,60 <br />0,00 <br />$380.16 <br />$0.00 <br />8 <br />2232.501 <br />