My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04-14-2004 Council Workshop Minutes
>
City Council Meeting Minutes
>
2000-2009
>
2004
>
04-14-2004 Council Workshop Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/14/2009 1:36:55 PM
Creation date
7/17/2008 8:56:14 AM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MINUTES OF THE WORKSIIOP MEETING <br />CITY COUNCIL <br />LITTLE CANADA, MINNESOTA <br />APR1L 14, 2004 <br />Pursuant to due call and notice thereof a workshop meeting of the City <br />Council of Little Canada, Minnesota was convened on the 14th day of <br />April, 2004 in the Council Chambers of the City Center located at 515 <br />Little Canada Road in said City. <br />Mayor Michael I. Fahey called the meeting to order at 6:30 p.m. and the <br />following members of the City Council were present at roll call: <br />CITY COUNCIL: Mayor Mr. Michael I. Fahey <br />Council Member Mr. Matt Anderson <br />Council Member Mr. Bill Blesener <br />Council Member Mr. Jim LaValle <br />Council Member Mr. Rick Montour <br />ALSO PRESENT: City Administrator Mr. Joel R. Hanson <br />City Engineer Mr. Lee Elfering <br />Public Works Dir. Mr. Greg Schroeder <br />MN DOT Mr. Frank Pafko <br />Commissioner Ms. Jan Wiesner <br />Deputy Clerk Ms. Kathy Glanzer <br />UNWEAVE The City Engineer reviewed the cost summary for the storm sewer <br />THE and watermain components of the Unweave the Weave and the Edgerton <br />WEAVE Bridge project. The Engineer provided a breakdown of costs on an area <br />basis beginning with the Edgerton Street bridge. Total storm sewer costs <br />for the Edgerton Street bridge project are estimated at $328,040 with the <br />County paying $]71,750 and the City's share at $156,290. The County's <br />and City's share of project costs are estimated based on a minimum State <br />Aid participation of 55% for the County and 45% for the City. The <br />Engineer reviewed the drainage area that will be served by the storm <br />sewer outlet at the Edgerton bridge site to 694. <br />Fahey asked if the City's share of the storm sewer is based on the fact that <br />in addition to the road surface run-off, a good share of run-off is coming <br />from the adjacent property. The Engineer replied that that was correct. <br />He also noted that the City has requested the storm sewer outlet to the <br />freeway because there is no room to construct ponds in this area. <br />
The URL can be used to link to this page
Your browser does not support the video tag.