My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08-25-2004 Council Minutes
>
City Council Meeting Minutes
>
2000-2009
>
2004
>
08-25-2004 Council Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/14/2009 1:38:08 PM
Creation date
7/17/2008 9:13:37 AM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MINUTES <br />CITY COUNCIL <br />AUGUST 25, 2004 <br />plan. Trade reported that H,RG has not reviewed these plans, and she <br />wanted to ensure that everything is being covered during the interim <br />period when City engineering services are being transferred from HRG to <br />Elfering & Associates. Trade reported that when she contacted HRG on <br />August 13°i, she was informed that H.RG had not reviewed nor approved <br />the July 31s' grading and drainage plans. <br />The City Administrator reported that Lee Elfering has always been the <br />point person for the Hidden Acres development, both as an employee of <br />HRG and after leaving the frm. The Administrator indicated that Elfering <br />will asswne responsibility for the Hidden Acres development as part of the <br />engineering transition plan. The Administrator noted that as part of the <br />transition, he instructed HRG not to assign a new engineer to the Hidden <br />Acres development as that development would be taken over by Elfering <br />& Associates. Therefore, there was a short period of time when it <br />appeared that there was no engineering coverage of this project. <br />Trade asked if there will now be one engineer on the job, and asked if Lee <br />Elfering has reviewed and approved the July 31" grading and drainage <br />plan. Elfering replied that he has reviewed the plan. Ile indicated that the <br />July 3l" grading and drainage plan is the result of his review and <br />comments on the initial grading and drainage plan. Elfering reported that <br />as long as all the issues he has raised in reviewing the grading and <br />drainage for Hidden Acres have been addressed, he has approved the plan. <br />Trade asked if he was reterring to the July 3l" grading and drainage plan. <br />Elfering replied that he was. Trade asked if the July 31" grading and <br />drainage plan is the plan that Elfering endorsed. The City Administrator <br />replied that the July 3 ]" plan is the only grading and drainage plan that is <br />approved for Hidden Acres. There was previous discussion about the <br />potential for a plan with berms, however, that plan has not been presented <br />or approved. <br />Mr. Blesener introduced the following resolution and moved its adoption: <br />RESOLUTION NO. 2004-8-194 -APPROVING, THE CITY <br />ENGINEERING CONTRACI'AS I?RESENTED AND MODIFIED ]3Y <br />T IIE CITY AI'TORNEYAND A UT HORIZING T /IE MAYOR AND <br />CITYADMINISTRAT072 TO Ea'ECUTE ON ]3EIIALF OF THE CITY <br />The foregoing resolution was duly seconded by LaValle- <br />Ayes (5) 131esener, LaValle, Fahey, Montow~, Anderson. <br />Nays (0). Resolution declared adopted. <br />14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.