MINUTES <br />Parks & Recreation Commission <br />one 5, 2003 <br />POWERLINE The City Engineer was present to discuss the two options for crossing Edgerton Street. The first <br />TRAIL option would involve an at-grade crossing with a push button activated stoplight. The cost for <br />this option is approximately $40,000-$60,000. The second option would be a pedestrian <br />underpass. The cost for the underpass would be significantly higher at approximately $300,000. <br />He also outlined other concerns with the underpass as stated in his letter to the Commission <br />dated June 5, 2003. <br />Since there wasn't a quorum present, the Commission Members could not vote on this issue. <br />However, the Commission Members present favored the at-grade crossing due to the high cost <br />of the underpass. Sanders commented that an underpass could always be considered in the <br />future. <br />Broten asked if the size of the 14' x 10' box could be reduced to result in cost savings since <br />there is only an 8' trail proposed. The City Engineer stated that it could probably be reduced to <br />12' x 10', but this would not result in much of a savings. <br />ADJOURN Broten recommended that the meeting be adjourned. <br />Motion seconded by Larsorz. <br />Motion carried 3 - 0. <br />There being no further business, the meeting was adjourned at 8:10 p.m. <br />Page 3 of 3 <br />