My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04-27-2016 Council Packet
>
City Council Packets
>
2010-2019
>
2016
>
04-27-2016 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/23/2019 10:28:18 AM
Creation date
5/13/2016 10:43:01 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
10062 Flanders Court NE – Blaine, MN 55449 – Ph: (763) 780-0450 Fax (763) 780-0452 <br /> <br />Memo-042216-CC (Bid Results & Award ).doc <br /> <br />Memo <br /> <br />TO: Honorable Mayor and City Council Members <br /> <br />FROM: Lee Elfering, City Engineer <br /> <br />DATE: April 22, 2016, 2016 <br /> <br />RE: Little Canada 2016 Street & Utility Improvements Project <br /> Bid Results & Recommendation for Award <br /> <br />Bids were opened for the above referenced project at 10:00 a.m. on Wednesday, April <br />13, 2016 in accordance with the Advertisement for Bids. The project consists of <br />improvements on the following streets and improvement areas: <br /> <br /> Aspen Circle <br /> Demont Avenue (McMenemy Street to Savage Lane) <br /> Morrison Street (Demont Avenue to south end) <br /> Miscellaneous Watermain Repairs <br /> Rondeau Park Basketball Court <br /> Old Fire Hall East Driveway <br /> <br />The Council authorized the street improvements at the public hearings on January 25, <br />2016 and the remaining three improvements are smaller projects that are included in the <br />City’s 2016 budget. A brief description of each of the small improvements follows: <br /> <br /> Miscellaneous W atermain Repairs – This work includes excavation and repair of <br />leaking valves throughout the City. These repairs have typically been done by a <br />Contractor on a time and material basis, but staff felt that better pricing may be <br />obtained from competitively bidding them with a street project. It is important to <br />note that none of the repair areas are within the streets included in the project. <br /> <br /> Rondeau Park Basketball Court – Drainage around the basketball court area is <br />relatively poor and the wet conditions have caused deterioration of the south 1/3 <br />of the court. The proposed improvements include the installation of some yard <br />inlets and draintile piping around the east and south end of the existing <br />basketball court along with removal and replacement of approximately 1/3 of the <br />basketball court. <br /> <br /> Old Fire Hall East Driveway – This improvement would include the construction <br />of a driveway on the east side of the existing Old Fire Hall building to access the <br />parking lot behind the building. Due to the limited property on the east side of the <br />building and the existing grades a retaining wall is necessary for the <br />improvement. <br /> <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.