Prepared by BKV Group, Commission No. 1164.06 13 <br />Project Phasing and Cost Estimates <br />Phase 1: Kitchen Remodeling <br />Demolish kitchen cabinets, countertops, appliances, and plumbing fixtures. Provide new cabinets, <br />countertops, appliances and plumbing fixtures. Provide new dining room furniture. Provide new <br />flooring and touch up paint. <br />Hard Costs: $ 40,000 <br />Soft Costs: $ 8,000 <br />Project Contingency: $ 4,800 <br />TOTAL: $ 52,800 <br /> <br />Phase 2: Apparatus Door Replacement and other Improvements <br />Remove four existing apparatus doors and operators and replace with new doors and operators <br />with significantly more glass. Install new door controls system compliant with UL 325. Restart <br />apparatus exhaust system and expand control systems if necessary. Install power washer system and <br />pedal operated hand sink near current rear apparatus door. Install curtain or half-height wall to limit <br />splashing from wash area to the remainder of the apparatus bay. Demolish existing and provide new <br />turnout lockers. Replace 5’ concrete aprons at front and rear of apparatus bays with new concrete <br />aprons with electric mat in-slab heat. Paint bollards. <br />Hard Costs: $ 68,000 <br />Soft Costs: $ 6,500 <br />Project Contingency: $ 7,500 <br />TOTAL: $ 82,000 <br /> <br />Phase 3: East Parking Lot <br />Tear down existing house, site grading on adjacent property (including stormwater detention area), <br />extend existing retaining wall and fence. Provide new landscape buffer, sod and irrigation, sidewalk. <br />Provide new curb and gutter and asphalt parking lot. <br />Hard Costs: $ 185,000 <br />Soft Costs: $ 28,000 <br />Project Contingency: $ 21,300 <br />TOTAL: $ 234,300 <br /> <br />Phase 4: East Apparatus Bay Addition (~1,625 sf) <br />Relocate gas meter. Cut access to new bay through existing exterior walls. Construct new <br />foundations, concrete floor, trench drain, exterior walls (masonry), steel joist structure, membrane <br />roofing, and apparatus doors. Relocate one exterior man door, re-route overflow roof drainage, <br />extend sprinklers, extend apparatus exhaust system, extend electrical, extend compressed air,