My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06-14-2017 Council Packet
>
City Council Packets
>
2010-2019
>
2017
>
06-14-2017 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/23/2019 10:28:07 AM
Creation date
6/22/2017 11:35:55 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
130
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> <br /> <br />City of Little Canada on behalf of <br />Ramsey County Department of Public Works <br />1425 Paul Kirkwold Drive <br />Arden Hills, MN 55112 <br />SUPPLEMENTAL AGREEMENT 5B <br /> <br />Contractor: Contractor‘s Address: State Aid Project No. <br />Hardrives, Inc. 14475 Quiram Drive S.A.P. 062-619-034 <br /> Rogers, MN 55374 <br /> <br />Project Location: Project Description: Account No. <br />Ryan Industrial Park Reconstruction, Full Depth Reclamation, <br /> Mill & Overlay 120180E <br /> <br /> <br />The Contract is amended as follows: <br />Groundwater conditions at the intersection of Spruce Street and Ryan Lane were saturating the street subgrade and base materi al in the <br />in watermain fitting excavations. Therefore the Engineer required the installation of drain tile to provide a means of removing the <br />water from the area. In addition the Engineer directed that flared end sections be used at the pipe inlet and outlet to allow a better <br />transition between the pipe and swale segments. <br /> <br />The Contract time will be revised for a final completion date of July 14, 2017 for the work in the Ryan Industrial Park area. No other <br />revision to the contract time is made for other areas of the project except as may be provided under that Contract provisions of <br />MN/DOT Specification 1806. <br /> <br />The Contractor shall not make any claim of any kind or character whatsoever for any other costs or expenses which he may have <br />incurred of which he may hereafter incur in performing the work and furnishing the materials required by this agreement. <br />ESTIMATE OF COSTS <br />Item No. Item Unit Unit Price Quantity Cost <br />2501.602 15” FES W/TRASH GUARD EACH $ 2,156.00 1 $ 2,156.00 <br />2501.602 18” FES W/TRASH GUARD EACH $ 2,376.00 1 $ 2,376.00 <br />2502.602 4” PERF TP DRAIN LF $ 18.00 220 $ 3,960.00 <br />2503.602 CONNECT TO EXISTING STRUCTURE EACH $ 550.00 1 $ 550.00 <br /> <br /> <br />Total Change to Contract $ 9,042.00 <br />S.A.P. 062-619-034, 200-120-011 <br />100% CITY COST <br /> <br /> <br /> <br /> <br /> Date Approved By <br /> City Engineer <br /> <br /> <br /> <br /> Date Accepted By <br /> Contractor <br /> <br /> <br /> <br /> Date Approved By <br /> City of Little Canada
The URL can be used to link to this page
Your browser does not support the video tag.