My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06-28-2017 Council Packet
>
City Council Packets
>
2010-2019
>
2017
>
06-28-2017 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/23/2019 10:28:07 AM
Creation date
6/28/2017 11:35:02 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
80
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PW 2017-06R Page 3 of 6 <br /> <br />(City Cost excluding the Prorated Items Cost) <br />City % Prorated Items = <br />(Total Project Cost excluding the Prorated Items Cost) <br /> <br />The costs in the Prorated Items calculation will be based on contract unit prices <br />and quantities at the time of contract award. No adjustments in the percentages <br />will be made if unit prices or quantities vary during construction. <br /> <br />4.4.4.5. Design Engineering <br /> <br />4.4.1.4.5.1. Design engineering will be provided by the County at no cost <br />to Little Canada and Maplewood. <br /> <br />4.5.4.6. Construction Engineering <br /> <br />4.5.1.4.6.1. Construction engineering will be provided by the County at no <br />cost to Little Canada and Maplewood. <br /> <br />5. Payment Schedule <br /> <br />5.1. Design engineering, construction engineering, and construction costs will be <br />invoiced upon substantial completion of the project, as determined by the <br />County. <br /> <br />5.2. Payment will be made by January 31, 2019. <br /> <br />5.2.5.3. Any disagreement in responsibility for a cost is solely a controversy between <br />the Cities, and does not affect the County’s collection of reimbursement for those <br />costs. In the event of disagreement as to responsibility of these costs , the <br />County may, at its sole discretion, invoice City of Little Canada for 30% and City <br />of Maplewood 70% of the costs of construction. The County will then be satisfied <br />in full, and the Cities will be able to resolve any controversy between <br />themselves. <br /> <br />6. Ownership and Maintenance Responsibility for Project Elements <br /> <br />6.1. Ownership and Maintenance Responsibility of the Roadway <br /> <br />6.1.1. Little Canada and Maplewood will continue to own and maintain the <br />roadway and associated roadway elements location within their Right of <br />Way. <br /> <br />7. The City grants the County temporary construction permits over all City owned rights- <br />of-way and property within the limits of the Project for use during construction at no <br />cost to the County. <br /> <br />Formatted: Normal
The URL can be used to link to this page
Your browser does not support the video tag.