My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06-07-2017 Parks & Rec Packet
>
Agenda Packets
>
2010-2019
>
2017
>
06-07-2017 Parks & Rec Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/23/2019 9:20:56 AM
Creation date
7/18/2017 12:03:23 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
25SHORT ELLIOTT HENDRICKSON INC.25SHORT ELLIOTT HENDRICKSON INC. <br />Comprehensive Park and Recreation Plan – <br />Long Lake, MN <br />SEH prepared a Comprehensive Park and Recreation Plan <br />to evaluate the City’s existing recreation facilities, open <br />space, and trail systems. Features of the plan included a <br />resource inventory, community survey, policy and ordinance <br />review, compliance, spatial and needs analyses, and a capital <br />improvement plan. <br />SEH services included landscape architecture, recreational <br />planning, civil engineering, public participation coordination, <br />and GIS. <br />HOFFMAN PARK AND GLEN PARK MASTER <br />PLAN – RIVER FALLS, WI <br />The project revitalized the winter recreation program for <br />cross-country skiing, downhill skiing, snowboarding, tubing, <br />sledding and snowshoeing for the community. The master <br />plan features included minimizing and mitigating impacts <br />on golf course facilities and operations, a new golf course <br />water hazard for pre-season snowmaking, and minimizing <br />and mitigating impacts on the Park’s natural assets such as <br />mature oak trees, prairie, and wetlands. <br />*Work performed by Anna Springer prior to SEH <br />Gl <br />e <br /> <br />P <br />a <br />r <br /> MA <br />S <br />T <br />E <br />R <br /> <br />P <br />L <br />A <br />N <br />N 0’100’300’ <br />EX <br />I <br />S <br />T <br />I <br />N <br />G <br />EX <br />I <br />S <br />T <br />I <br />N <br />G <br />E <br />X <br />I <br />S <br />T <br />I <br />N <br />G <br />SWIN <br />G <br />I <br />N <br />G <br /> <br />B <br />R <br />I <br />D <br />G <br />E <br />A <br />B <br />D <br />C <br />E <br />F G <br />H <br />H <br />J <br />I <br />K <br />L <br />M <br />N <br />O <br />U <br />W <br />W <br />W <br />W <br />V <br />X <br />X <br />Y <br />Z <br />Z <br />AA <br />AC <br />AD <br />AE <br />AF <br />AG <br />AH <br />AI <br />AB <br />P <br />Q <br />R <br />ST <br />W PARK ST <br />BAR <br />T <br />O <br />S <br />H <br /> <br />L <br />N <br />W CASCADE AVE <br />G <br />L <br />E <br />N <br /> <br />P <br />A <br />R <br />K <br /> <br />R <br />D <br />kinnickinn <br />i <br />c <br /> <br />r <br />i <br />v <br />e <br />r <br />ki <br />n <br />n <br />i <br />c <br />k <br />i <br />n <br />n <br />i <br />c <br /> <br />r <br />i <br />v <br />e <br />r <br /> <br />s <br />o <br />u <br />t <br />h <br /> <br />f <br />o <br />r <br />k <br />PROPOSED IMPROVEMENTS <br />EXISTING FEATURES AND PROJECTS <br />A Swinging Bridge <br />B Bathhouse and Pool Storage <br />C Picnic Shelter <br />D Pickleball Courts <br />E Narrow right-of-way with landscape and add signage near residence to restrict parking <br />PARKING / ROADWAY CIRCULATION <br />F New parking west of the pool (± 110) <br />G New drop o area west of the pool <br />H Loop road closed to vehicular visitor access (Trails to remain drivable for emergency/ public safety vehicles) <br />I Reconstructed west roadway <br />J New drop o area for paddlers north of the pickleball courts <br />P New parking at southwest corner of the park (± 45); connect to event buliding with trail <br />AC Reconstructed parking on east side of the park (± 25) with option to expand <br />EVENT BUILDING <br />K New gathering/ event building with restrooms <br />L Repurpose existing building for maintenance use <br />M Remove restroom and maintenance buildings <br />ATHLETICS / RECREATION <br />N Basketball relocated <br />O Relocated and reoriented youth baseball/ softball eld <br />Q Existing volleyball removed and replaced with new basketball court <br />AD New ooded winter ice skating rink <br />AE Horseshoes removed <br />MUNICIPAL POOL <br />S Expanded pool deck <br />T New plaza-style splash pad <br />U Removal of wading pool <br />PLAYGROUND <br />V Construct new nature-theme playground <br />W Remove smaller playgrounds <br />TRAILS AND OTHER AMENITIES <br />X Multi-Use trail connection to existing trail north and south of Lake George <br />Y Natural surface trails maintained in the downhill portion of the park <br />Z Multi-use trail along West Park Street and Glen Park Road <br />AA Reconstructed, stabilized trail to Kinnickinnic River for river access with trailhead kiosk <br />AB Overlook to north <br />AF Reconstruct east restrooms and add warming house space <br />AG Gazebo at terminus view of bridge <br />R Small landscaped entry zone with sign <br />AH Landscaped corner with sign and directional sign to main entry <br />AI Landscaped trail entry zone across the Swinging Bridge next to Cascade Ave <br />lake louise <br />Figure 3.3 Glen Park Master Plan <br />City of River Falls - Homan Park Master Plan - June 2015 37 <br />Downtown Central Park Plaza – Valparaiso, IN <br />SEH landscape architects led the redevelopment of half <br />a city block into a downtown park and amphitheater. <br />With its large lawn, strolling gardens, water features, and <br />performance pavilion, the park has become the new hub for <br />downtown activities. <br />Features of the project include a pavilion with rest rooms, an <br />interactive splash pad, rain gardens, an entry pergola with <br />seating, and a large open lawn. Pavilion architecture was <br />designed by DO Architects of Valparaiso, Indiana.
The URL can be used to link to this page
Your browser does not support the video tag.