My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09-13-2017 Council Packet
>
City Council Packets
>
2010-2019
>
2017
>
09-13-2017 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/23/2019 10:28:07 AM
Creation date
9/14/2017 10:57:11 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> STAFF REPORT <br /> <br /> <br /> <br />TO: Mayor Keis and Members of City Council <br /> <br />FROM: Joel Hanson, City Administrator <br />DATE: September 8, 2017 <br /> <br />RE: Old Fire Hall Evaluation Committee Notes – Meeting II <br /> <br /> <br />The Old Fire Hall Evaluation Committee consisting of the members listed below met at the OFH on <br />Wednesday, August 30th. <br /> <br />Committee Members in Attendance: <br />• Little Canada Historical Society – Don Gagne <br />• Little Canada Recreation Association – Jon Joriman <br />• Little Canada Fire Department – Chief Don Smiley <br />• Parks & Recreation Commission – Peter Schletty <br />• Citizen at Large – Dick Flipp (Brooks Avenue resident) <br />• City Council Member – Mike McGraw <br />• City Council Member – Tom Fischer <br />• Parks & Recreation/Community Services Manager – Bryce Shearen <br />• Public Works Director – Bill Dircks <br />• City Administrator – Joel Hanson <br /> <br />Committee Members Absent: <br />• Planning Commission – Bill Buesing (architecture background) <br />• St. John’s Church – Kevin Hamernick <br /> <br />The committee was provided with last year’s meeting summary and the other background materials. <br />They were asked to make a recommendation on the exterior finish program for the property. <br />The consensus recommendations of the Committee to the City Council are as follows: <br /> <br />• Try to match the original appearance of the building as closely as reasonably possible. <br />• The exterior brick surface on the front of the building should be replaced. Best efforts should <br />be made to match the existing brick as closely as possible. (Previous estimates placed that cost <br />at around $85,000) <br />• The remaining three sides of the building should be cleaned (removed loose paint), repair wall <br />cracks, replace cracked block, replaced broken glass block with solid block to eliminate <br />maintenance issue given they do not provide essential lighting for the upper level, make sure <br />roof flashing is in good shape and possibly replace it with tile like originally existed. Repaint <br />three exterior walls. <br />• We should install “old style” lights over doors to more closely approximate how the building <br />originally looked. (See photo attached) They should be LED and red in color.
The URL can be used to link to this page
Your browser does not support the video tag.