My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10-05-2017 Parks & Rec Packet
>
Agenda Packets
>
2010-2019
>
2017
>
10-05-2017 Parks & Rec Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/23/2019 9:20:56 AM
Creation date
10/12/2017 2:18:21 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> STAFF REPORT <br /> <br /> <br /> <br />TO: Parks & Recreation Commission <br /> <br />FROM: Bryce Shearen, Parks and Recreation/Community Services Manager <br /> <br />DATE: September 28, 2017 <br /> RE: Noel Drive Sidewalk <br />T.A. Schifsky and Son has prepped the segment of sidewalk along Noel Drive from Little Canada Road <br />north to the City Hall driveway. The concrete has been scheduled to be poured on Monday, October 2, <br />and the remaining work should be substantially completed the week of October 2 with some restoration <br />work still left to be finished. There are truncated domes at the Little Canada Road pedestrian ramp as <br />required by the American’s with Disabilities Act but domes are not required at the driveway pedestrian <br />ramp. <br />This segment was installed to get people safely across and off of Little Canada Road at the intersection <br />with Noel Drive. There were discussions about continuing the sidewalk north of the driveway to Gervais <br />Mill Park but the costs associated with doing that were prohibitive. It can be addressed again at some <br />point if so desired. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.