Laserfiche WebLink
New/Nonprogrammed Items: <br /> Gervais Mill Park Drinking Fountain – $10,000 <br /> Noel Drive Sidewalk – City Hall Lot to Gervais Trail – $100,000 - $150,000 <br />depending on design option chosen with higher number associated with <br />retaining wall work. (Lower cost would be placing sidewalk directly behind <br />curbing with higher cost associated with the sidewalk being located on middle <br />level of walls by water tower. Note: Numbers lower than attached report given <br />part of sidewalk was constructed in 2017.) <br /> Outdoor Scoreboard at Pioneer Soccer Field - $10,000 <br /> Waterworks, Sextant, and Sunset Court Trail Loop – $230,000 <br /> Reforestation for All Parks – $25,000 per year <br /> Purchase of Sculley Property for Nature Area - $275,000 <br /> Replace Fountain at Spooner Upper Shelter - $4,000 <br /> Installation of Bike Racks around the City - $300 - $500 <br />(Recommendations on locations) <br /> Installation of Bike Repair Station/s - $1,100/ea. (Recommendations on <br />locations) <br /> Screening around Portable Restrooms in Parks - $1,500 estimate <br /> Dog Play Products at Demont Dog Park - $3,000 - $4,000 <br /> Permanent Dog Park Site – $10,000 - $30,000 <br />o Potential locations: <br /> Thunder Bay Park/Westwind Park <br /> Spooner Park <br /> Additional locations? <br /> Community Garden - $5,000 - $25,000 <br />o Potential locations <br /> Pioneer Park <br /> Spruce/South Owasso <br /> Edgerton Street <br /> Suggestions? <br /> Tunnel under Edgerton Street – Work on Edgerton is planned for 2019. The Box culvert <br />and related restoration is estimated at $210,000. Other street/storm sewer work would <br />run about $150,000, but if done in conjunction with road work, will be substantially less. <br />One alternative to this project is a flashing pedestrian crossing signal. That is estimated <br />at $5,000 to $10,000. <br /> Northwest Corner of Spooner Park – Clean underbrush, possible open space, additional <br />parking, Canadian Days usage, and/or Reforestation, etc. - $20,000? <br /> Additional Parking at Spooner Park (Increase the bituminous lot size) – We will try to <br />have a better estimate of this cost by Thursday’s meeting. <br /> Benches throughout the City - $1000/ea. <br /> New Trash Receptacles around City - $500 - $800/ea. <br /> Other??? <br /> <br />