Laserfiche WebLink
ENGINEERS ESTIMATE <br />PROJECT: SPOONER PARK <br />ENGINEER: ELFERING & ASSOCIATES <br />ITEM ITEM DESCRIPTION <br />NO.UNIT QTY UNIT PRICE TOTAL PRICE <br />($) ($) <br />SCHEDULE 1.0 - STAND-ALONE PARKING LOT <br />1 2021.501 MOBILIZATION LS 1.00 10,000.00 10,000.00 <br />2 2101.502 CLEARING TREE 9.00 250.00 2,250.00 <br />3 2101.507 GRUBBING TREE 9.00 250.00 2,250.00 <br />4 2104.501 REMOVE CONCRETE CURB AND GUTTER LF 60.00 7.00 420.00 <br />5 2104.511 SAW CUT CONCRETE (FULL DEPTH)LF 5.00 10.00 50.00 <br />6 2104.513 SAW CUT BITUMINOUS (FULL DEPTH)LF 42.00 5.00 210.00 <br />7 2105.501 COMMON EXCAVATION (P)CY 285.00 15.00 4,275.00 <br />8 2105.525 TOPSOIL BORROW (CV)CY 35.00 35.00 1,225.00 <br />9 2211.501 AGGREGATE BASE CLASS 5 (PARKING LOT)TON 90.00 20.00 1,800.00 <br />10 2232.501 MILL BITUMINOUS PAVEMENT SY 15.00 8.00 120.00 <br />11 2350.501 TYPE MV4 WEAR COURSE MIXTURE (PARKING LOT)TON 70.00 90.00 6,300.00 <br />12 2350.502 TYPE LV3 NON WEARING COURSE MIXTURE (BASE) (PARKING) TON 90.00 90.00 8,100.00 <br />13 2503.541 12" RC PIPE SEWER DES 3006, CLV LF 115.00 30.00 3,450.00 <br />14 2503.602 CONNECT TO EXISTING STORM SEWER MANHOLE EACH 1.00 1,000.00 1,000.00 <br />15 2506.502 CONST DRAINAGE STRUCTURE (CB)EACH 1.00 2,500.00 2,500.00 <br />16 2531.501 CONCRETE CURB & GUTTER LF 400.00 16.00 6,400.00 <br />17 2531.602 PEDESTRIAN CURB RAMP EACH 1.00 450.00 450.00 <br />18 2563.601 TRAFFIC CONTROL LS 1.00 1,800.00 1,800.00 <br />19 2573.502 SILT FENCE, TYPE MACHINE SLICED LF 450.00 2.25 1,012.50 <br />20 2573.520 SEDIMENT REMOVAL BACKHOE HOURS 10.00 145.00 1,450.00 <br />21 2573.530 INLET PROTECTION (WIMCO)EACH 2.00 250.00 500.00 <br />22 2573.530 INLET SEDIMENT REMOVAL EACH 6.00 105.00 630.00 <br />23 2573.602 TEMPORARY ROCK CONSTRUCTION ENTRANCE EACH 1.00 1,800.00 1,800.00 <br />24 2575.545 WEED SPRAYING SY 220.00 2.50 550.00 <br />25 2575.604 SEEDING SY 220.00 5.00 1,100.00 <br />26 2582.501 PAVEMENT MESSAGE (HANDICAP SYM) - EPOXY EACH 1.00 350.00 350.00 <br />27 2582.502 4" SOLID WHITE LINE - EPOXY LF 180.00 2.50 450.00 <br />SCHEDULE 1.0 - STAND-ALONE PARKING LOT - TOTAL 60,442.50 <br />SCHEDULE 2.0 - JOINING PLAY AREAS (EXHIBIT 2A) <br />1 2021.501 MOBILIZATION LS 1.00 5,000.00 5,000.00 <br />2 2101.502 CLEARING TREE 2.00 195.00 390.00 <br />3 2101.507 GRUBBING TREE 2.00 50.00 100.00 <br />4 2104.501 REMOVE CONCRETE CURB AND GUTTER LF 140.00 6.00 840.00 <br />5 2104.507 REMOVE SAND MATERIAL CY 290.00 15.00 4,350.00 <br />6 2104.509 REMOVE AND REPLACE BENCH EACH 2.00 1,500.00 3,000.00 <br />7 2104.511 SAW CUT CONCRETE (FULL DEPTH)LF 5.00 8.00 40.00 <br />8 2105.501 COMMON EXCAVATION (P)CY 150.00 15.00 2,250.00 <br />9 2531.501 18" HIGH PLAY AREA CURB LF 70.00 35.00 2,450.00 <br />10 2573.502 SILT FENCE, TYPE MACHINE SLICED LF 100.00 2.00 200.00 <br />11 2575.545 WEED SPRAYING SY 40.00 10.00 400.00 <br />12 2575.604 SEEDING LS 1.00 500.00 500.00 <br />SCHEDULE 2.0 - JOINING PLAY AREAS (EXHIBIT 2A) - TOTAL 19,520.00 <br />SCHEDULE 3.0 - NEW PLAY AREA <br />1 2021.501 MOBILIZATION LS 1.00 5,000.00 5,000.00 <br />2 2101.502 CLEARING TREE 2.00 195.00 390.00 <br />3 2101.507 GRUBBING TREE 2.00 50.00 100.00 <br />4 2104.501 REMOVE CONCRETE CURB AND GUTTER LF 445.00 6.00 2,670.00 <br />5 2104.507 REMOVE SAND MATERIAL CY 290.00 15.00 4,350.00 <br />6 2104.509 REMOVE AND REPLACE BENCH EACH 4.00 1,500.00 6,000.00 <br />ENGINEERS ESTIMATE <br />