Laserfiche WebLink
ITEM ITEM DESCRIPTION <br />NO.UNIT QTY UNIT PRICE TOTAL PRICE <br />($) ($) <br />ENGINEERS ESTIMATE <br />7 2105.507 GRANULAR BORROW CY 575.00 15.00 8,625.00 <br />8 2502.603 4" DRAIN TILE LF 450.00 4.00 1,800.00 <br />9 2531.501 18" HIGH PLAY AREA CURB LF 450.00 25.00 11,250.00 <br />10 2573.502 SILT FENCE, TYPE MACHINE SLICED LF 250.00 2.00 500.00 <br />11 2575.545 WEED SPRAYING SY 250.00 2.50 625.00 <br />12 2575.604 SEEDING LS 1.00 2,000.00 2,000.00 <br />SCHEDULE 3.0 - NEW PLAY AREA - TOTAL 43,310.00 <br />SCHEDULE 4.0 - LEAVE SOUTH PLAY AREA AND ADD NEW (EXHIBIT 2C) <br />1 2021.501 MOBILIZATION LS 1.00 5,000.00 5,000.00 <br />2 2104.501 REMOVE CONCRETE CURB AND GUTTER LF 200.00 6.00 1,200.00 <br />3 2104.507 REMOVE SAND MATERIAL CY 290.00 15.00 4,350.00 <br />4 2104.509 REMOVE AND REPLACE BENCH EACH 4.00 1,500.00 6,000.00 <br />5 2105.507 GRANULAR BORROW CY 250.00 15.00 3,750.00 <br />6 2502.603 4" DRAIN TILE LF 175.00 4.00 700.00 <br />7 2531.501 18" HIGH PLAY AREA CURB LF 175.00 25.00 4,375.00 <br />8 2573.502 SILT FENCE, TYPE MACHINE SLICED LF 250.00 2.00 500.00 <br />9 2575.545 WEED SPRAYING SY 250.00 2.50 625.00 <br />10 2575.604 SEEDING LS 1.00 2,000.00 2,000.00 <br />SCHEDULE 4.0 - LEAVE SOUTH PLAY AREA AND ADD NEW (EXHIBIT 2C) - TOTAL 28,500.00 <br />SCHEDULE 5.0 - ADA TRAIL CONSTRUCTION <br />1 2021.501 MOBILIZATION LS 1.00 5,000.00 5,000.00 <br />2 2104.513 SAW CUT BITUMINOUS (FULL DEPTH)LF 60.00 5.00 300.00 <br />3 2104.505 REMOVE BITUMINOUS PAVEMENT SY 520.00 2.20 3,212.00 <br />4 2105.501 COMMON EXCAVATION (P)CY 65.00 15.00 975.00 <br />5 2105.507 GRANULAR BORROW CY 535.00 15.00 8,025.00 <br />6 2211.501 AGGREGATE BASE CLASS 5 (TRAIL)TON 395.00 20.00 7,900.00 <br />7 2211.501 AGGREGATE BASE CLASS 5 (SIDEWALK)TON 60.00 20.00 1,200.00 <br />8 2350.501 TYPE MV4 WEAR COURSE MIXTURE (TRAIL)TON 85.00 95.00 8,075.00 <br />9 2411.604 RETAINING WALL SF 495.00 25.00 12,375.00 <br />10 2521.518 4" CONCRETE WALK SF 2,355.00 4.00 9,420.00 <br />11 2573.502 SILT FENCE, TYPE MACHINE SLICED LF 700.00 2.25 1,575.00 <br />12 2575.545 WEED SPRAYING SY 2,680.00 0.50 1,340.00 <br />13 2575.604 SEEDING SY 2,680.00 2.00 5,360.00 <br />SCHEDULE 5.0 - ADA TRAIL CONSTRUCTION - TOTAL 64,757.00 <br />SCHEDULES WITH 10% CONTINGENCY AND 25% OVERHEAD <br />SCHEDULE 1.0 - STAND-ALONE PARKING LOT - TOTAL 81,597.38 <br />SCHEDULE 2.0 - JOINING PLAY AREAS (EXHIBIT 2A) - TOTAL 26,352.00 <br />SCHEDULE 3.0 - NEW PLAY AREA - TOTAL 58,468.50 <br />SCHEDULE 4.0 - LEAVE SOUTH PLAY AREA AND ADD NEW (EXHIBIT 2C) - TOTAL 38,475.00 <br />SCHEDULE 5.0 - ADA TRAIL CONSTRUCTION - TOTAL 87,421.95 <br />Deduct <br />If a bituminous path is installed around the existing play area instead of a concrete sidewalk ($4,400.00) <br />If ADA sidewalk consists of area shown on Exhibit 2c instead of 2a ($15,300.00) <br />Note: Costs do not include play equipment and play surface. <br />