Laserfiche WebLink
<br />• Replace Skate Park Equipment - $20,000 <br />• Edgerton Entrance Landscaping - $2,000 <br />• Gervais Mill Park Garden - $51,750 (Priority #1) <br />• Batting cage building roof - $1,500 <br />• Habitat Restoration (Thunder Bay/Westwinds Park) - $25,000 <br />• Message Center at Pioneer Park - $1,000 <br />2020-Programmed Projects: <br />• Trail Maintenance/Repair - $190,000 <br />• Lower Shelter (Open Air Shelter and Concrete) - $75,000 <br />• Other Maintenance/Repair/Trimming - $38,000 <br />• Pioneer Park Playground - $250,000 (Priority #3) <br />New/Nonprogrammed Items: <br />• Gervais Mill Park <br />o Gervais Mill Park Drinking Fountain – $10,000 <br />• Spooner Park <br />o Spooner Park entrance monument sign at Centerville Road and Eli Road - <br />$17,250 <br />o Replacement of Lower Shelter at Spooner Park (run water and sewer) - $419,750 <br />o Replacement of Lower Shelter at Spooner Park with open-air style shelter & <br />Concrete - $75,000 <br />o Additional Parking at Spooner Park (increase the bituminous lot size) – $80,000 <br />o Sand Volleyball Court Repairs - $10,000 <br />o ‘Makerspace’ area - $5,000 <br />o Stone steps to creek - ? <br />o Accessible path to amphitheater area - ? <br />o Update existing path to band shell - ? <br />• Pioneer Park <br />o Install a flagpole with lighting at the entrance - $6,900 <br />o Install new drinking fountain near tennis courts - $23,000 <br />• Thunder Bay/Westwinds Park <br />o Information Sign - $1500 <br />• Trails/Sidewalks <br />o Waterworks, Sextant, and Sunset Court Trail Loop – $230,000 <br />o Power Line Trail (Edgerton to Pioneer Park) - $200,000 <br />o Install Trail – Country Drive & South Owasso loop along waterworks trail - <br />$250,000 <br />• Miscellaneous <br />o Reforestation for All Parks – $25,000 per year <br />o Purchase of Sculley Property for Nature Area - $275,000 <br />o Installation of Bike Racks around the City - $300 - $500/ea.