My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06-12-2019 Workshop & Council Packet
>
City Council Packets
>
2010-2019
>
2019
>
06-12-2019 Workshop & Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/8/2019 2:05:42 PM
Creation date
7/8/2019 1:51:56 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
120
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PARTIAL PAY ESTIMATE #1 <br />FROM: <br />TO: <br />CONTRACTOR:STANDARD CONTRACTING <br />ADDRESS:PO BOX 250, HAMPTON, MN 55031 <br />OWNER:CITY OF LITTLE CANADA <br />PROJECT: <br />SUBSTANTIAL COMPLETION DATE AMOUNT OF CONTRACT <br />June 15, 2019 ORIGINAL: <br />REVISED: <br />ITEM SPEC. <br />NO. REF.ITEM DESCRIPTION UNIT QTY.UNIT PRICE QTY.TOTAL PRICE QTY.TOTAL PRICE <br />SCHEDULE 1.0 - SPOONER PARK IMPROVEMENTS <br />1 2021.501 MOBILIZATION LS 1.00 $11,750.00 0.50 $5,875.00 0.50 $5,875.00 <br />2 2101.502 CLEARING TREE 11.00 $368.00 14.00 $5,152.00 14.00 $5,152.00 <br />3 2101.507 GRUBBING TREE 11.00 $240.00 14.00 $3,360.00 14.00 $3,360.00 <br />4 2104.501 REMOVE PLAY AREA PERIMETER CURB LF 460.00 $8.95 443.00 $3,964.85 443.00 $3,964.85 <br />5 2104.503 REMOVE BITUMINOUS PAVEMENT SF 4,820.00 $1.00 3000.00 $3,000.00 3000.00 $3,000.00 <br />6 2104.503 REMOVE CONCRETE SF 35.00 $12.40 0.00 $0.00 0.00 $0.00 <br />7 2104.513 SAW CUT BITUMINOUS (FULL DEPTH) LF 35.00 $10.00 8.00 $80.00 8.00 $80.00 <br />8 2105.501 COMMON EXCAVATION (P)CY 195.00 $24.85 195.00 $4,845.75 195.00 $4,845.75 <br />9 2105.507 GRANULAR BORROW (CV) (P) CY 1,460.00 $23.60 932.00 $21,995.20 932.00 $21,995.20 <br />10 2105.525 SAND MEDIA CY 85.00 $37.75 90.00 $3,397.50 90.00 $3,397.50 <br />11 2211.501 AGGREGATE BASE CLASS 5 TON 740.00 $27.75 158.33 $4,393.66 158.33 $4,393.66 <br />12 2350.501 TYPE WEAR COURSE MIXTURE (TRAIL) TON 65.00 $137.00 0.00 $0.00 0.00 $0.00 <br />13 2350.501 TYPE NONWEAR COURSE MIXTURE (TRAIL) TON 65.00 $137.00 0.00 $0.00 0.00 $0.00 <br />14 2502.541 4" PERF TP DRAIN AND ROCK TRENCH LF 125.00 $26.80 0.00 $0.00 0.00 $0.00 <br />15 2502.541 4" PERF TP DRAIN W/SOCK LF 200.00 $16.65 180.00 $2,997.00 180.00 $2,997.00 <br />16 2503.503 4" SCHEDULE 40 PVC PIPE SEWER LF 40.00 $23.75 40.00 $950.00 40.00 $950.00 <br />17 2506.502 27" DIA. STORM STRUCTURE EACH 1.00 $4,800.00 1.00 $4,800.00 1.00 $4,800.00 <br />18 2531.507 CONCRETE SIDEWALK (4" THICK) SF 2,015.00 $6.75 0.00 $0.00 0.00 $0.00 <br />19 2545.503 4" NON-METALLIC CONDUIT (INCLUDES FITTINGS) LF 25.00 $47.20 0.00 $0.00 0.00 $0.00 <br />20 2563.601 TRAFFIC CONTROL LS 1.00 $590.00 1.00 $590.00 1.00 $590.00 <br />21 2571.524 TRANSPLANT TREE TREE 6.00 $240.00 3.00 $720.00 3.00 $720.00 <br />22 2573.502 SILT FENCE, TYPE MACHINE SLICED LF 1,550.00 $3.25 1540.00 $5,005.00 1540.00 $5,005.00 <br />23 2573.602 TEMPORARY ROCK CONSTRUCTION ENTRANCE EACH 1.00 $1,750.00 1.00 $1,750.00 1.00 $1,750.00 <br />24 2573.607 ROADWAY ROCK CHECK DAM CY 20.00 $102.00 0.00 $0.00 0.00 $0.00 <br />25 2574.525 TOPSOIL BORROW CY 50.00 $59.00 0.00 $0.00 0.00 $0.00 <br />26 2574.550 PLANTING SOIL CY 25.00 $75.00 35.00 $2,625.00 35.00 $2,625.00 <br />27 2575.505 SEEDING ACRE 1.05 $10,300.00 0.00 $0.00 0.00 $0.00 <br />28 SPEC TRACER WIRE (DRAIN TILE)LF 325.00 $1.20 0.00 $0.00 0.00 $0.00 <br />29 SPEC DENSITY TEST EACH 5.00 $110.00 1.00 $110.00 1.00 $110.00 <br />30 SPEC PROCTOR TEST EACH 1.00 $290.00 0.00 $0.00 0.00 $0.00 <br />31 SPEC GRADATION TEST EACH 1.00 $290.00 0.00 $0.00 0.00 $0.00 <br />32 SPEC AIR VOIDS EACH 1.00 $460.00 0.00 $0.00 0.00 $0.00 <br />33 SPEC CONCRETE TESTING, CYLINDERS (SET OF 3) EACH 1.00 $460.00 0.00 $0.00 0.00 $0.00 <br />34 SPEC EXTRACTION/GRADATION EACH 1.00 $450.00 0.00 $0.00 0.00 $0.00 <br />35 SPEC NUCLEAR BITUMINOUS DENSITY EACH 3.00 $300.00 0.00 $0.00 0.00 $0.00 <br />SCHEDULE 1.0 - SPOONER PARK IMPROVEMENTS - TOTAL $75,610.96 $75,610.96 <br />May 1, 2019 <br />May 31, 2019 <br />SPOONER PARK IMPROVEMENTS <br />THIS PERIOD TOTAL TO DATE <br />ORIGINAL: <br />REVISED: <br />ORIGINAL CONTRACT <br />$166,513.25 <br />1 of 2
The URL can be used to link to this page
Your browser does not support the video tag.