My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07-24-2019 Council Minutes
>
City Council Meeting Minutes
>
2010-2019
>
2019
>
07-24-2019 Council Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/4/2019 3:38:17 PM
Creation date
11/4/2019 3:38:13 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MINUTES <br />CITY COUNCIL <br />JULY 24, 2019 <br />• NO BUSINESS ACTIVITIES SHALL OCCUR WITHIN THE <br />GARAGE SIR UCTURES <br />• THE PARCEL SHALL NO LONGER BE ELIGIBLE FOR AN <br />ACCESSORY SHED <br />• NO DRIVEWAY SHALL BE INSTALLED TO THE REAR <br />GARAGE <br />The foregoing resolution was duly seconded by Fischer. <br />Ayes (5). <br />Nays (0). Resolution declared adopted. <br />CONSENT Montour introduced the following resolution and moved its adoption: <br />AGENDA <br />RESOLUTION NO. 2019-7-85 -APPROVING THE CONSENT <br />AGENDA WHICH CONTAINS THE FOLLOWING: <br />*APPROVAL OF THE VOUCHERS; <br />*CALL FORA WORKSHOP ONAUGUST 28, 2019 AT 6: 00 P.M. TO <br />DISCUSS THE 2020 CAPITAL IMPROVEMENT PLAN BUDGET <br />The foregoing resolution was duly seconded by Fischer. <br />Ayes (5). <br />Nays (0). Resolution declared adopted. <br />LITTLE CANADA The Public Works Director stated that the paver sidewalk along Little <br />ROAD SIDEWALK Canada Road between Rice Street and the railroad tracks needs to be <br />PROJECT FINAL repaired. He reported that this project was discussed at the June 24th <br />SPECIFICATIONS Council meeting, and the City Engineer was authorized to prepare final <br />plans and specifications, along with alternate bids for a concrete option <br />rather than remove and replace the existing pavers. <br />Madeline Dahlheimer, landscape architect with Bolton & Menk, stated <br />that the goal with the improvements is to keep the same theme and <br />possibly expand on the planting space. She reviewed the three options. <br />She explained that the first option is to remove the existing pavers, level <br />the base, and replace the bricks. She stated a second option is to <br />completely remove the pavers and replace with standard and stamped and <br />colored concrete that would mimic the look of the current pavers. She <br />reviewed a third option which has a mix of pavers and concrete. She <br />explained that an option would be to expand on the planting areas in the <br />boulevard area space. She stated this would reduce the impervious area, <br />and the larger space would allow the planting to grow better and soften <br />the look of the corridor. <br />
The URL can be used to link to this page
Your browser does not support the video tag.