Laserfiche WebLink
City Center Generator Wiring -The first step to ensure that the City Center can be used <br />as an emergency operations center is to wire apower/generator disconnect and <br />connection system in the City Center. The connection plugs would be sized to <br />match our existing large generator and other contract/rent generators. <br />Post Driver -Our existing compressor powered post driver is old and worn our. The <br />proposed 2002 replacement cost is $1,200. <br />Air Compressor -Our Sullair Compressor has seen a lot of use since it was purchased in <br />1982. It is wearing out and should be replace in 2004 at an estimated cost of <br />$15,300. <br />Page 1 ~ <br />