My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03-05-2020 Parks & Rec Packet
>
Agenda Packets
>
2020-2029
>
2020
>
03-05-2020 Parks & Rec Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/1/2020 3:17:19 PM
Creation date
6/12/2020 2:43:47 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> <br />6 <br /> <br />Proposal Details <br />6. Production Schedule, Installation Schedule, and Storage. When Seller has received and accepted the contract <br />along with signed approval drawings and credit approval, they will have up to 16 weeks to produce and deliver <br />the materials provided that there are no custom materials needed. Custom materials will include non-standard <br />colors and/or materials. The Purchaser will be contacted after the receipt of the required information to <br />coordinate a shipping date and an installation date(s). These dates will serve as the contract delivery date and <br />will be used to schedule production, delivery, and installation. The Owner/Purchaser will be contacted 21 days <br />prior to shipping to confirm that the site will be ready. If the Purchaser's site is not ready or will not be ready on <br />this date, the following may occur: <br />Dasher Board Systems <br />A. Seller may choose whether or not to produce the rink according to its production schedule. If they produce <br />the rink on schedule, it will be stored at Becker Arena Product’s location of business and storage fees will <br />be charged to the Purchaser at the rate of US $300 per week. All payments will be due according to the <br />terms from the original ship date. If the Seller chooses to delay production to coincide with the new ship <br />date, no storage fees will apply and payment will be due according to the terms from t he original ship <br />date. If contract terms are paid in full prior to shipping, the time will start from the original ship date and <br />not the adjusted ship date. <br /> <br />B. A new shipping installation date will be coordinated with Seller's installation department and confirmed <br />with the Purchaser. The Seller will reschedule the installation for the next available date according to the <br />Seller’s installation schedule. In some cases, the site delay may cause additional charges. This includes, <br />but is not limited to, wages, remobilization, and equipment rental, to be paid by the Purchaser. <br /> <br />C. If the Purchaser's site is not ready when the Seller's installation crew arrives, additional costs will be <br />charged to the Purchaser. This includes, but is not limited to wages, travel, lodging, meals, equipment <br />rental and changes in Becker Arena Product’s installation schedule. <br /> <br />7. General Site Requirements. The following criteria must be met or extra charges may apply, and delays will be <br />incurred, if the site is not in compliance when Seller is ready to deliver and install the goods: <br />A. Concrete and Floor Work: All concrete work is to be completed and allowed to cure, according to job <br />specifications and/or refrigeration contractors requirements, before the date installation is scheduled to <br />begin. <br /> <br />B. The levelness of the perimeter concrete, where the rink is to be installed, must be within 1/8" of levelness <br />for every 10' in length and no more than 1/4” difference in height over the length and width of the <br />perimeter surface. <br /> <br />C. For sand floors, the first 6" from the front of the curb, where the rink is to be installed, must be within <br />1/16" of flatness from the inside edge outward and meet the levelness and flatness conditions specified <br />above, Sand floors are not to be final graded prior to dasher board installation. <br /> <br />D. Expansion joints, which are to be covered completely by the rink, are to be within 1/2” of straightness <br />from end to end and side to side. The distance from side to side and end to end of the outside edge of the <br />expansion joint is to be within 1/2” of the required dimension for the frame to cover it. <br /> <br /> <br /> <br /> <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.