Laserfiche WebLink
<br /> <br /> <br />7 <br /> <br />Proposal Details <br /> <br /> <br />E. If, upon arrival, the perimeter concrete is inspected and does not meet the specifications for levelness, <br />flatness, straightness and size, the following will occur: <br /> <br />1. Seller's Representative will determine if rink can be shimmed or adjusted/cut to achieve desired <br />levelness, fit and/or expansion joint coverage while maintaining the structural integrity of the <br />rink. If so, the additional time and materials to do this will be paid by the Purchaser. A change <br />order must be filled out by the Seller's Representative and signed by the Purchaser before any <br />work commences. <br /> <br />2. If the rink cannot be shimmed or adjusted to the desired levelness and/or coverage while <br />maintaining the structural integrity of the rink, the Purchaser will be responsible for fixing the <br />surface to meet specifications. All associated costs for this are the sole responsibility of the <br />Purchaser. <br /> <br />3. The Seller will accept contracts that are retrofit projects with the understanding that the condition <br />of the underlying perimeter concrete work meets the specifications stated above. If, after removal <br />of the existing rink, the concrete does not meet these conditions, points “1” and “2” from above <br />will apply. <br /> <br />8. Requirements for Rink Installations: <br /> (Refer to the enclosed Site Requirements) <br />9. Walk Through Inspection. When Seller's work is complete or near complete, Purchaser or the Purchaser's <br />Representative (including general contractors and architects) must be available for a final walk through inspection <br />with the Seller's Representative. Any parties who do not attend the walk through will forfeit their right to submit <br />punch list items. A final punch list of items to be completed or repaired will be prepared as a result of this walk <br />through. Any item not included on the final “punch list” will not be the responsibility of the Seller unless it is <br />covered by the Seller's Warranty. <br />10. Shop Drawings and Non-standard Shielding. Preparation of shop drawings will not commence until after the <br />signed contract has been delivered to Seller. Production will not commence until Seller receives approved shop <br />drawings. Field measured, tempered glass (non-standard sizes) may require an additional 3-4 weeks for delivery <br />after completion of installation. Any field measured tempered glass to be installed by purchaser. <br />11. Polyethylene. All polyethylene used to manufacture the rink shall be virgin material. All colors shall match <br />within manufacturer's tolerance. Seller will not be responsible for replacing polyethylene that conforms to <br />manufacturers color tolerance. During manufacturing, all panels shall have the polyethylene overhang past the <br />frame a minimum of 1/16” on each end to allow for contraction of the material due to temperature change in the <br />field. Seller shall not be responsible for material contraction gaps between panels due to temperature change if it <br />adheres to these manufacturing requirements. <br /> <br /> <br /> <br /> <br />