Laserfiche WebLink
<br />ELECTRICAL PERMIT FEES <br />All Services Circuits and Feeders <br />0 – 300 amp $50 $55 0 – 30 100 amp $8 $9 <br />400 amp $58 $71 31 – 100 amp $10 <br />500 amp $72 $87 101 – 200 amp $15 <br />600 amp $86 $103 201 - 300 amp $20 $21 <br />800 amp $114 $135 301 - 400 amp $25 $27 <br />1000 amp $142 $167 401 - 500 amp $30 $33 <br />1100 amp $156 $183 501 - 600 amp $35 $39 <br />1200 amp $170 $199 601 - 700 amp $40 $45 <br />Add $14 $16 for each additional 100 amps Add $5 $6 for each additional 100 amps <br /> <br />Minimum Fee: Minimum permit fee is $40 $45 plus $1.00 state <br />surcharge. This is for one inspection only. <br />Minimum fee for rough-in inspection and final is <br />$80 $90 plus $1.00 state surcharge. <br />Maximum Fee: Maximum fee for single family dwelling or <br />townhouse not over 200 amps is $175 $190 plus <br />$1.00 state surcharge. Maximum of 3 inspections. <br />Apartment Buildings: Maximum fee per unit of an apartment or <br />condominium complex is $70 $80. This does not <br />cover service, unit feeders, or house panels. A <br />separate permit must be issued for house wiring. <br />Swimming Pools & Hot Tubs: $80 $90 + circuits (Includes 2 inspections) <br />Additions, Remodels, or Basement Finishes $80 $90 (Includes 10 circuits and 2 inspections) <br />Residential Accessory Structures The greater of $50 $55 for panel plus $8 $9 per <br />circuit OR $80 $90 for 2 inspections <br />Traffic Signals: $7 $8 per each standard <br />Street Lighting & Parking Lot Lights: $4 $5 per each standard <br />Transformers/Generators: $10 $5 up to 10 KVA, $40 11 KVA to 74 KVA, <br />$60 75 KVA to 299 KVA, $150 $165 over 299 <br />KVA <br />Retro Fit Lighting: $.65 $0.85 per fixture <br />Sign Transformer or Driver: $8 $9 per transformer <br />Remote Control/Signal Circuits: $.75 per device <br />Low voltage fire alarm, low voltage heating <br />& air conditioning control wiring <br />$0.85 per device <br />Hourly Rate for Carnivals $90 <br />Re-inspection Fee: $40 $45 <br /> <br />State Surcharge $1.00 <br />** The fee is doubled if the work starts before the permit is issued. <br />