My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02-26-2020 Council Packet
>
City Council Packets
>
2020-2029
>
2020
>
02-26-2020 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/10/2021 5:03:13 PM
Creation date
9/10/2021 4:42:14 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STAFF REPORT <br />TO:Mayor Keis and Members of the City Council <br />FROM:Mark D. Kasma, P.E., City Engineer <br />DATE:February 17, 2020 <br />RE:Little Canada – 2020 Sewer Rehabilitation Project <br />ACTION TO BE CONSIDERED: <br />Motion to award the Little Canada 2020 Sanitary Sewer Rehabilitation Project to Hydro-Klean, <br />LLC in the amount of $110,946.30. <br />BACKGROUND: <br />The City has been looking into sanitary sewer lining as a rehabilitation option for a number of <br />years. It was brought forward during discussions of the 2020 Capital Improvement Plan and was <br />included in the 2020 CIP and funds were also budgeted in future years. <br />On February 14, 2020 quotes were opened for the City’s 2020 Sanitary Sewer Rehabilitation <br />Project. Since the construction cost was anticipated to be less than $175,000 and there was the <br />need to facilitate quick competitive pricing, the City prepared plans and specifications along with <br />an invitation to be competitively quoted between five (5) contractors per MN Statute Section <br />471.345 Subd. 4. <br />The project consisted of approximately 5,000 LF of 8” cured-in-place (CIPP) pipe rehabilitation <br />with alternate bids to facilitate pricing for multiple completion date scenarios as discussed below. <br />The CIPP will take place along the entire stretch of Greenbrier Street as well as County Road D <br />from the west side of Arcade to County Road D. These areas were televised in advance of the <br />2020 street reconstruction project and there was evidence of infiltration in more than 50% of the <br />pipe joints, making these areas perfect candidates for a CIPP project. <br />Base Bid – Completion of the work prior to May 1st, 2020. <br />Bid Alternate 1 – Completion of the work prior to December 31, 2020. <br />The following bid abstract identifies the range of bids for the Base Bid and the Alternate.
The URL can be used to link to this page
Your browser does not support the video tag.