Laserfiche WebLink
BIDDERS BASE BID ALTERNATIVE 1 <br />1 Hydro-Klean, LLC $110,946.30 $110,946.30 <br />2 Insituform Technologies USA, LLC $120,915.10 $120,915.10 <br />3 Visu-Sewer, Inc.$122,524.50 $122,524.50 <br />4 SAK Construction, LLC $153,839.00 $153,839.00 <br />5 Veit & Company, Inc.$169,072.00 $169,072.00 <br />The base bid requires that the contractor complete all work on this project prior to May 1st, 2020. <br />This requires the contractor to complete the work during the months of March and April 2020 <br />and complete the work prior to the street reconstruction project starting on May 2nd, 2020. This <br />option is preferred due to its ability to get these pipelines rehabbed sooner, which limits inflow <br />and infiltration (I/I) into the pipe (and reduces wastewater treatment costs), and also provides a <br />structural rehabilitation to the sanitary sewer system before the roadway construction activities <br />commence above it. <br />The alternate bid requires that the contractor complete all work on this project by December 31, <br />2020. This requires the contractor to complete their work between November 16, 2020 and <br />December 31, 2020 when the roadway is not under construction. This option was provided to <br />allow the contractor more flexibility in their schedule to complete the work and potentially see <br />better unit pricing once bid. <br />Because the bid prices were identical for both situations, the earlier completion date provides <br />more benefit to the city regarding lower wastewater treatment costs and effectively minimizes <br />the risk of compromising the deteriorated sewer during the time at which the roadway <br />improvements are being completed above it.