Architecture + Engineering + Environmental + Planning ISGInc.com <br />OTHER CONSIDERATIONS <br />Design & Construction Considerations <br />• The most efficient and economically sensitive <br />process to complete this project is for the City of <br />Little Canada to engage a contractor to execute the <br />project as design build <br />• The contractor could then complete the project <br />over a period of time that is agreeable to both <br />parties <br />• The City shall complete a basic site survey before <br />construction begins <br />• The City shall complete a soil compaction test of the <br />area prior to any paving installation <br />• Building inspector should be present during <br />construction to ensure building codes are followed <br />• Construction should occur during a dry time of year, <br />most likely late summer or fall <br />• Planting should occur in late summer or early spring <br />• Should the City request, ISG can propose a time <br />and materials hourly fee for design, review, and/or <br />construction administration to ensure design intent <br />is met <br />PERMITS SUBMITTAL REQUIREMENTS TIMELINE APPLICATION FEES <br />USACE Pre-Application Consultation <br />(Recommended for this project due to complexity) <br />This process will help determine the type and <br />course of USACE permits required <br />Not Applicable <br />USACE Minnesota Joint Wetland Application Submittal Requirements: <br />• Joint Wetland App <br />• 24x36 Plan Set <br />60 days <br />Anticipating a “no-loss determination” <br />$215 <br />USACE St. Paul District <br />Piers and Docks Regional General Permit <br />*Dependent upon ultimate scope, a Minor Discharges Regional General <br />Permit may apply in lieu of Piers and Docks Regional General Permit. <br />Submittal Requirements: <br />• ENG 4345 (preconstruction notification (PCN) <br />permit) <br />• 8.5x11 Plans & pdf copy <br />60 days Not Applicable <br />City Street ROW Permit <br />*Needed for installation of utilities or placing of obstructions in <br />ROW during construction <br />Submittal Requirements: <br />• ROW Permit App <br />• Permit App Fee <br />• Two 24x36 plan sets <br />1 week $200 <br />NPDES Construction Stormwater General Permit <br />Notice of Intent (NOI) & <br />Notice of Termination (NOT) <br />*Required if land disturbance is 1 acre or more. <br />Submittal Requirements: <br />(Online Submittal) <br />• SWPPP <br />Coverage is effective 1 day <br />after submittal of NOI. <br />$400 <br />City Building Permit Submittal Requirements: <br />• Building Permit App <br />• Permit App Fee <br />• Two 24x36 plan sets <br />• Certificate of survey <br />1-2 weeks Permit fee based on project value (see <br />attachment) <br />+ <br />Plan Check Fee = 65% of the calculated <br />permit fee <br /> + <br />State Surcharge = 0.0005 x the value of <br />the job <br />City Filling and Grading Permit <br />*Note: If over 100 yards is brought in, Council approval and a <br />$300 deposit are also required. <br />*Follow-up with city is needed to confirm whether a “Planning <br />Application” for “Grading/Excavating” will also be needed. This <br />would require an addition $300 fee. <br />Submittal Requirements: <br />• Filling & Grading App <br />• Application Fee <br />• Two 24x36 plan sets <br />1 week Permit fees are based on the Minnesota <br />Uniform Building Code. <br />Recommend confirming fee with City <br />prior to submittal <br />City Sign Permit Submittal Requirements: <br />• Permanent Sign Permit App <br />• Permit App Fee <br />• Two 24x36 plan sets <br />1 week Same as for Building Permit <br />Estimated Fees <br />Based on a preliminary project <br />summary and subject to change <br />$1,200.00 <br />8