My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04-08-2020 Council Packet
>
City Council Packets
>
2020-2029
>
2020
>
04-08-2020 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/10/2021 5:03:13 PM
Creation date
9/10/2021 4:50:20 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PW 2020-07 Page 3 of 7 <br /> <br />(City Cost excluding the Prorated Items Cost) <br />City % Prorated Items = <br />(Total Project Cost excluding the Prorated Items Cost) <br /> <br />The costs in the Prorated Items calculation will be based on contract unit prices <br />and quantities at the time of contract award. No adjustments in the percentages <br />will be made if unit prices or quantities vary during construction. <br /> <br />4.4. Design Engineering Costs <br />4.4.1. The County shall pay the City a design engineering fee equal to no more <br />than 12% of identified County’s project items as detailed in Exhibit A. <br />4.4.2. Design engineering fees shall be calculated based on the quantities and <br />unit prices at the time of contract award. <br /> <br />4.5. Construction Engineering Costs <br />4.5.1. The County shall pay the City a construction engineering fee equal to no <br />more than 12% of identified County’s project items as detailed in Exhibit <br />A. <br /> <br />4.5.2. Construction engineering and administration fees shall be calculated <br />based on the final contract quantities and unit prices. <br />5. Payment Schedule <br /> <br />5.1. Design engineering will be invoiced at the time of contract award. <br /> <br />5.2. The City will invoice the County for construction costs incurred on a monthly <br />basis or as determined by the payment schedule for the contractor. <br /> <br />5.3. Construction engineering will be invoiced at the time of substantial project <br />completion, as determined by the County. <br /> <br />5.4. Payment will be made within 30 days of receipt of an invoice. <br /> <br />6. Ownership and Maintenance Responsibility for Project Elements <br /> <br />6.1. Ownership and Maintenance Responsibility of the Roadway <br /> <br />6.1.1. The County will own and maintain the roadway and associated roadway <br />elements location within the County Right of Way, except as detailed <br />below. <br /> <br />6.2. Ownership and Maintenance Responsibility of the Storm Sewer (catch basins <br />and leads, main, infiltration systems, ponding, water treatment) <br />
The URL can be used to link to this page
Your browser does not support the video tag.