My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04-08-2020 Council Packet
>
City Council Packets
>
2020-2029
>
2020
>
04-08-2020 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/10/2021 5:03:13 PM
Creation date
9/10/2021 4:50:20 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />City of Carver <br />Main Street Park – Natural Resources Restoration and <br />Enhancement <br />Site Acres: 5 acres Floodplain/Mesic Prairie <br /> .75 miles Streambank Stabilization <br /> 3 acres Floodplain Forest <br /> 5 acres Upland Forest/Woodland <br /> <br />$160,000 - Streambank Stabilization (3/4 mile – 2 sides of stream channel) <br />There are several locations along the stream where the banks are showing signs of <br />undermining. Prior to any upland restoration these areas will require bank stabilization <br />and restoration. This would include hiring an engineering firm with experience in <br />streambank stabilization as well as a contractor to implement stabilization. <br />$22,750 - Floodplain/Mesic Prairie (5 acres) <br />$6,750 Site prep (removal and herbicide of non-native vegetation w/ aquatic safe <br />herbicide), flail mowing, and erosion control <br />$12,000 Seeding and seed <br />$4,000 3yrs establishment (mowings and spot herbicide treatments) <br />$45,800 - Floodplain Forest (3 acres) <br />$6,800 Woody invasive removal - Cut and stump treat woody invasives. Material <br />would need to be chipped and hauled off. <br />$6,000 2 years follow up maintenance of treatment area <br />$8,000 Floodplain forest seeding <br />$10,000 Trees and shrubs <br />$15,000 Up to 100 volunteer tree planting event (supplies, recruitment and labor to host <br />an event) <br />$20,000 - Upland Forest/Woodland (5 acres) <br />$20,000 Woody invasive removal with 2 years follow up maintenance of - Cut and <br />stump treat or basal bark woody invasives. <br />$3,600 – Natural Resources Management Brief <br />$35,000 – Project oversight and management, grant administration,
The URL can be used to link to this page
Your browser does not support the video tag.