Laserfiche WebLink
Year Project Type Location Description Cost Project Description <br />2024 Buildings City Center Misc. office furniture 3,000$ <br />2024 Administration Computers & Network Switches 14,000 Four year replacement schedule <br />2024 Administration Council computer reimbursement 1,250 Each member receives up to $1,000 every 4 years <br />2024 Administration Phones 200 <br />2024 Fire Building repairs 2,450 <br />2024 Parks & Recreation Gervais Mill Boardwalk 75,000 Identified in Park Master Plan <br />2024 Parks & Recreation Nadeau Wildlife Park Benches 3,500 Identified in Park Master Plan <br />2024 Parks & Recreation Spooner Park Buckthorn removal 7,400 <br />2024 Parks & Recreation Spooner Park Field repair maintenance 6,000 <br />2024 Parks & Recreation Spooner Park Bank shell structure 100,000 Identified in Park Master Plan <br />2024 Parks & Recreation Spooner Park Stone steps to creek 60,000 Identified in Park Master Plan <br />2024 Parks & Recreation Park & Recreation consultant 10,000 <br />2024 Public Works Equipment PW Truck 40,000 Replace 2014 Ford F150 (unit 114) <br />2024 Public Works Equipment Loader/backhoe 100,000 Replace 1990 Case (unit 190) <br />2024 Public Works Equipment Water Tank 4,000 <br />2024 Public Works Equipment Bobcat Snowblower 6,500 <br />2024 Public Works Equipment Speed board 3,500 <br />Funded with General Capital Improvements (Fund 400)436,800 <br />2024 Streets Nadeau Rd. (Country Dr. to Condit)149,410 Mill/Overlay <br />2024 Streets Country Drive (RR tracks to S Owasso)568,400 Reclaim/Pave (Possible MSA project) <br />2024 Streets Yorkton Blvd. (S Owasso to end)250,000 Reclaim/Pave <br />2024 Streets Yorkton Court 172,000 Reclaim/Pave <br />2024 Storm Pond cleanout 15,000 <br />Funded with Infrastructure Capital Improvements (Fund 450)1,154,810 <br />2024 Trails Waterworks trail connection 200,000 South of OFH <br />2024 Trails Future Trail acquisition/appraisal 5,000 <br />Funded with Park Land Acquisition (Fund 456)205,000 <br />2024 Water/Sewer Water meter gateway & software 8,000 <br />2024 Water/Sewer Generator 100,000 <br />2024 Water/Sewer Force main -LS 50,000 <br />2024 Water/Sewer Lining sanitary 50,000 Slip lining <br />2024 Water/Sewer Misc. line repairs 50,000 <br />2024 Water/Sewer Sunset Court Lift Station- pump 20,000 <br />2024 Water/Sewer Lift Station-Controller 8,000 <br />2024 Water/Sewer Lift Station-Upgrades 10,000 <br />2024 Water/Sewer Keller Lift Station-Pumps 19,000 <br />Funded with Water/Sewer Replacement Fund (Fund 604)315,000 <br />Total 2024 Projects 2,111,610$ <br />CITY OF LITTLE CANADA <br />CAPITAL PROJECTS <br />2024 Projects <br />17DRAFT DOCUMENT 10-09-2020