My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10-14-2020 Workshop Packet
>
City Council Packets
>
2020-2029
>
2020
>
10-14-2020 Workshop Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/13/2022 3:37:56 PM
Creation date
1/13/2022 3:09:40 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
155
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Year Project Type Location Description Cost Project Description <br />2025 Buildings City Center Misc. office furniture 3,000$ <br />2025 Administration Computers 8,000 Four year replacement schedule <br />2025 Administration Network switches 6,000 Four year replacement schedule <br />2025 Administration Council computer reimbursement 1,250 Each member receives up to $1,000 every 4 years <br />2025 Fire Building repairs 2,450 <br />2025 Parks & Recreation Spooner Park Buckthorn removal 7,400 <br />2025 Public Works Equipment Toolcat 58,000 Replace 2019 Toolcat(unit 319) <br />2025 Public Works Equipment Front end loader 130,000 Replace 2010 Caterpillar (unit 110) <br />2025 Public Works Equipment Pothole patcher 25,000 Replace 2015 tow-behind (unit 215) <br />2025 Public Works Equipment Snowblower 4,500 <br />2025 Public Works Equipment Concrete mixer 2,000 <br />Funded with General Capital Improvements (Fund 400)247,600 <br />2025 Streets Sunrise Drive (2nd phase to end)71,400 Reclaim/Pave <br />2025 Streets Country Drive (So Owasso to LC Road)630,000 Reclaim/Pave <br />2025 Streets Stoneridge Court 175,000 Reclaim/Pave <br />2025 Streets Sunset Court 160,000 Reclaim/Pave <br />2025 Storm Pond cleanout 15,000 <br />Funded with Infrastructure Capital Improvements (Fund 450)1,051,400 <br />2025 Trails Future Trail acquisition/appraisal 5,000 <br />Funded with Park Land Acquisition (Fund 456)5,000 <br />2025 Fire Rescue/utility vehicle 623,805 <br />Funded with Fire Equipment Replacement Fund (Fund 457)623,805 <br />2025 Water/Sewer Generator 45,000 200 kw generator to replace 2000 model <br />2025 Water/Sewer Lining sanitary 50,000 Slip lining <br />2025 Water/Sewer Misc. line repairs 50,000 <br />2025 Water/Sewer Booster Station Pump 21,000 <br />2025 Water/Sewer Booster Station Roof 8,000 <br />2025 Water/Sewer Lift station upgrades 10,000 <br />2025 Water/Sewer Dianna Lane lift station 19,000 <br />Funded with Water/Sewer Replacement Fund (Fund 604)203,000 <br />Total 2025 Projects 2,130,805$ <br />CITY OF LITTLE CANADA <br />CAPITAL PROJECTS <br />2025 Projects <br />18DRAFT DOCUMENT 10-09-2020
The URL can be used to link to this page
Your browser does not support the video tag.