My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01-26-2022 Council Packet
>
City Council Packets
>
2020-2029
>
2022
>
01-26-2022 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/31/2022 3:32:31 PM
Creation date
1/27/2022 2:19:07 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
82
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
– 2 – November 15, 2021 <br /> <br />The property is currently zoned as R-1 (Low-Density Residential District). The <br />developer is requesting preliminary/final plat approval for 15 single family homes, <br />with variances as outlined below. The required density is 4 units per acre, the <br />proposed plan provides 2.42 units per acre. <br /> <br /> R-1 Proposed <br />Front 30 25* <br />Side 7.5 7.5 <br />Corner Side 20 25 <br />Rear 40 30* <br />Interior Lot Area 10,000 SF (min) 10,000 SF (min) <br />Corner Lot Area 11,000 SF (min) 11,000 SF (min) <br />Width (Minimum) <br />Interior <br />Corner <br /> <br />75 <br />80 <br /> <br />65* <br />70* <br />Depth (Minimum) <br />Interior <br />Corner <br /> <br />130 <br />130 <br /> <br />110* <br />110* <br />*indicates variance needed (Lot width/depth, Front & rear setbacks) <br /> <br /> <br />Preliminary Plat Analysis: <br /> Site Use (current): Single Family Residential Dwelling <br /> Topography: 872 (sw), 868 (se), 868 (ne), 916 (nw) <br /> <br />The site plan shows 15 single family lots, with a public access off Labore Road. <br />There is a proposed cul-de-sac turnaround (50’ ROW, 31’ b-b street, 41.5’ Radius <br />CDS). <br /> <br />The public utility services will be accessed from the existing sanitary sewer located <br />to the south of the proposed development located in a city owned outlot. The <br />watermain will be connected to the existing watermain line within Labore Road. <br />The building, driveways, and streets within the site will drain to the proposed <br />internal storm sewer system (pond/filtration basin) on the south side of the site. <br />The pond will outlet to the wetland in the south east corner of the site. <br /> <br />The stormwater management will be a combination of a proposed pond/filtration <br />basin. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.