My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04-14-2021 Council Packet
>
City Council Packets
>
2020-2029
>
2021
>
04-14-2021 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/31/2022 4:05:19 PM
Creation date
1/31/2022 4:03:22 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
280
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />6 Northwest Asphalt $625,234.70 $72,773.17 $698,007.87 <br />7 Meyer Contracting Inc. $678,088.95 $88,301.95 $766,390.90 <br />8 Forest Lake Contracting $669,776.00 $99,827.00 $769,603.00 <br />9 Veit & Company, Inc. $729,119.55 $112,167.30 $841,286.85 <br /> <br /> <br />The City received extremely competitive bids for the 2021 Street Improvements Project, and the <br />low bid from T.A. Schifsky & Sons was significantly lower than the City Engineer’s estimate of <br />$836,981.80. According to Bolton & Menk, this is consistent with the competitive bidding <br />climate that we have seen this Spring throughout the Metro Area. We have worked with T.A. <br />Schifsky & Sons on similar projects in the past and have found their work to be timely with good <br />workmanship. <br /> <br />The following is a table identifying the feasibility report estimated project costs as compared to <br />the low bid project costs for the City: <br />Task Feasibility Report Low Bid <br />Street & Utilities $812,490 $593,730 <br />Contingency $121,874 $29,686 <br />Engineering $178,453 $112,170 <br />Testing $15,000 $15,000 <br />Total $1,127,817 $750,586 <br /> <br />As shown in the table above, the low bid significantly reduces the projected engineering fees. <br />Our contract with Bolton & Menk currently includes a cap of 18% for local roads and 20% for <br />Municipal State Aid (MSA) roads. This reduction in engineering fees as a percent of the total <br />project cost would provide the level of service typically provided for on our reconstruction <br />projects. Bolton & Menk has prepared the following table that outlines the specific tasks and <br />associated costs required to complete the project. <br /> <br />Task <br />Project <br />Manager Inspector <br /> Senior <br />Inspector <br />Survey <br />Crew <br />Comm. <br />Specialist Admin. Cost <br /> $165 $115 $173 $155 $94 $102 <br />Contract Prep/Mailing 1 2 $ 369 <br />Shop Drawings & Submittals 1 5 $ 1,030 <br />Preconstruction Meeting 3 1.5 $ 755 <br />Project Inspector 500 $ 57,500 <br />Senior Inspector Oversight 30 $ 5,190
The URL can be used to link to this page
Your browser does not support the video tag.