Laserfiche WebLink
<br /> <br /> STAFF REPORT <br /> <br /> <br /> <br />TO: Mayor Keis and Members of the City Council <br /> <br />FROM: Bill Dircks, Public Works Director <br />Mark D. Kasma, P.E., City Engineer <br /> <br />DATE: April 14, 2021 <br /> <br />RE: 2021 Street Improvements <br /> <br />ACTION TO BE CONSIDERED: <br />Motion to award the 2021 Street Improvements to T.A. Schifsky & Sons, Inc. in the amount of <br />$593,729.91, which includes an increase in engineering fees above the contracted percentage <br />with a not-to-exceed percentage of 25%. <br /> <br />BACKGROUND: <br />On April 1, 2021 bids were opened for the 2021 Street Improvements Project. The project is for <br />street and utility improvements on Greenbrier Circle and Old County Road C (from County Road <br />C to Ruth Street). The initial estimate that was included in the Capital Improvement Plan was <br />$1,144,050. Following the development of plans and specifications, the Engineer’s estimate was <br />reduced to $836,981.80. <br /> <br />The project also includes catch basin repairs on Twin Lake Boulevard and Minnesota Avenue. <br />The catch basins in this area are an old design that are falling apart and need to be replaced along <br />with some corrugated metal pipe that has deteriorated between the Minnesota catch basins. Staff <br />worked with Bolton & Menk to create a specification and included this repair as an alternate bid <br />in the 2021 street project with the hope that the price for this work would remain below the 2021 <br />budgeted amount for these projects. <br /> <br />The total bids ranged from $593,729.91 to $841,286.85 including the alternate catch basin work. <br />The following is a summary of the nine bids received: <br /> <br /> Bidders 2021 Streets <br />(Part 1-4) <br />Catch Basins <br />(Part 5) <br />Total <br />Bid <br />1 T.A. Schifsky & Sons, Inc. $533,740.61 $59,989.30 $593,729.91 <br />2 Asphalt Surface Technologies <br />Corporation $562,487.71 $62,732.32 $625,220.03 <br />3 OMG Midwest Inc. dba <br />Minnesota Paving & Materials $576,842.24 $62,936.68 $639,778.92 <br />4 Bituminous Roadways Inc. $616,243.25 $64,499.85 $680,743.10 <br />5 Park Construction Company $612,331.10 $79,105.65 $691,436.75