My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04-28-2021 Council Packet
>
City Council Packets
>
2020-2029
>
2021
>
04-28-2021 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2022 4:05:45 PM
Creation date
2/9/2022 3:17:54 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
113
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Page 2 of 8 <br /> <br /> <br />The estimated total cost of the COMPANY Work to be performed by the COMPANY as <br />indicated in the estimate of cost attached hereto and marked “Exhibit B” is $133,844.05 The <br />ROAD AUTHORITY shall reimburse the COMPANY for all material costs, estimated at <br />$37,844.05. <br /> <br />The COMPANY warrants that it shall perform all of the COMPANY Work under this <br />Agreement in a workmanlike and timely manner in accordance with all applicable standards <br />for work of the type at issue. <br /> <br />2.2 WORK BY THE ROAD AUTHORITY. The ROAD AUTHORITY shall furnish or <br />cause to be furnished, at its expense, all of the labor, material and work equipment required to <br />perform and complete the following work (the “ROAD AUTHORITY WORK”): <br /> <br />a. The paving of the roadway approaches up to the edge of the concrete crossing surface. <br />b. Traffic control and detour signing. <br />c. Incidental work necessary to complete the items hereinabove specified. <br /> <br />2.3 The COMPANY Work and the ROAD AUTHORITY Work shall be completed within <br />18 months of fully executing this agreement. <br /> <br />SECTION 3. The ROAD AUTHORITY shall maintain jurisdiction for the roadway and will <br />be responsible for maintaining the roadway and crossing approaches up to the ends of the track <br />ties at its expense. The COMPANY shall operate and maintain its track, the crossing over its <br />ties and the crossing warning devices in accordance with Federal or State law as it shall be <br />from time to time in the future while it operates its line of railroad over such trackage and <br />crossing, but this obligation to maintain said crossing and warning devices shall cease in the <br />event the COMPANY abandons its railroad operations over said track in the future, in which <br />event the ROAD AUTHORITY may, if it desires, remove the trackage and restore and maintain <br />the crossing at its sole cost and expense. <br /> <br />SECTION 4. This Agreement shall be binding upon the parties hereto, their successors or <br />assigns. <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.