My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10-13-2021 Council Packet
>
City Council Packets
>
2020-2029
>
2021
>
10-13-2021 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2022 4:05:46 PM
Creation date
2/9/2022 3:54:38 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
168
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
515 Little Canada Road, Little Canada, MN 55117-1600 <br />(651)766-4029 / FAX: (651) 766-4048 <br />www.littlecanadamn.org <br />MAYOR <br />John Keis <br />COUNCIL <br />Michael McGraw <br />Tom Fischer <br />Christian Torkelson <br />Teresa Miller <br />September 29, 2021 <br />RE: Pioneer Park Phase I Implementation: Engineering Services <br />The City of Little Canada is soliciting quotes for engineering services to prepare final layout, <br />construction documentation, and bidding materials to implement the proposed improvements to <br />Pioneer Park located at 2950 Centerville Road in Little Canada. The project scope includes final <br />design of a proposed play node of approximately 54,000 square feet identified in the concept <br />plan of the Phase 1 Master Plan (see attached). These improvements include the following <br />items: <br />•Two playgrounds (for ages 2-5 and 5-12); including unique elements such as a tower <br />structure and obstacle/challenge course equipment <br />•An interactive water feature with naturalized hardscape elements, ground jets, and rock <br />misters/bubblers <br />•Site amenities including a shelter, benches, decorative screen fence, and site landscaping <br />•Site layout and design supporting the integration of elements, multi-use spaces, and <br />intuitive flow between activities <br />PROJECT SCOPE <br />FINAL DESIGN <br />The first phase of the project includes the development of the final design and preliminary site <br />layout. During the final design phase, design elements from the conceptual layout will be <br />examined and refined into a final design package with the locations of major amenities, play <br />equipment, water feature elements, shelter, landscaping, and utilities. Deliverables include: <br />Final design layout plan with proposed improvements identified and limited site <br />improvement details to illustrate design intent <br />Prepare preliminary cost opinion to accompany final design package <br />Attend one (1) meeting to deliver final design package and collect feedback from staff <br />prior to proceeding into construction documents <br />CONSTRUCTION DOCUMENTATION The selected engineer will develop construction <br />documents for the elements described in Task 1: Final Design. Minor modifications are <br />anticipated based on feedback provided by staff in the previous phase, including progress review <br />meetings at 60% and 90% for staff feedback. Deliverables include:
The URL can be used to link to this page
Your browser does not support the video tag.