My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12-01-2021 Council Packet
>
City Council Packets
>
2020-2029
>
2021
>
12-01-2021 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2022 4:05:46 PM
Creation date
2/9/2022 4:02:08 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
145
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF LITTLE CANADA <br />RYAN DRIVE - PRELIMINARY ENGINEER'S ESTIMATE <br />DATE: 11/02/21 <br />ITEM NO.MNDOT <br />SPEC.NO DESCRIPTION UNIT UNIT COST QUANTITY PRICE <br />10 REMOVE BITUMINOUS PAVEMENT SY $15.00 70 $1,050.00 <br />11 COMMON EXCAVATION CY $40.00 20 $800.00 <br />12 SUBGRADE EXCAVATION CY $40.00 70 $2,800.00 <br />13 AGGREGATE BASE (CV) CLASS 5 CY $40.00 20 $800.00 <br />14 BITUMINOUS PATCH SY $50.00 67 $3,350.00 <br />15 CONNECT TO EXISTING MANHOLE EA $4,500.00 1 $4,500.00 <br />16 2" HDPE SANITARY SERVICE (HDD - TRENCHLESS)LF $25.00 900 $22,500.00 <br />17 4" DIA CLEANOUT/ACCESS MANHOLE W/HDPE RINGS AND CASTING EA $5,500.00 2 $11,000.00 <br />$46,800.00 <br />$4,680.00 <br />$51,480.00 <br />$9,266.40 <br />$60,746.40 <br />18 REMOVE BITUMINOUS PAVEMENT SY $20.00 48 $960.00 <br />19 COMMON EXCAVATION CY $50.00 27 $1,350.00 <br />20 AGGREGATE BASE (CV) CLASS 5 CY $40.00 27 $1,080.00 <br />21 BITUMINOUS PATCH SY $100.00 48 $4,800.00 <br />22 E/ONE GRINDER PUMP EA $7,500.00 3 $22,500.00 <br />23 2" HDPE SANITARY SERVICE LATERAL LF $25.00 330 $8,250.00 <br />24 ELECTRICAL HOOKUP EA $3,500.00 3 $10,500.00 <br />25 PRIVATE CONNECTION CONTINGENCY EA $1,500.00 3 $4,500.00 <br />$53,940.00 <br />$5,394.00 <br />$59,334.00 <br />$10,680.12 <br />$70,014.12 <br />10% CONTINGENCY <br />CONSTRUCTION SUBTOTAL PART 4: PRIVATE SANITARY SEWER <br />PROJECT TOTAL PART 3: PUBLIC FORCEMAIN <br />PROJECT TOTAL PART 4: PRIVATE FORCEMAIN <br />PART 3: PUBLIC FORCEMAIN <br />PART 4: PRIVATE FORCEMAIN <br />CONSTRUCTION SUBTOTAL PART 3: PRIVATE SANITARY SEWER <br />10% CONTINGENCY <br />TOTAL CONSTRUCTION PART 3: PRIVATE SANITARY SEWER <br />18% ENGINEERING & INDIRECT <br />18% ENGINEERING & INDIRECT <br />TOTAL CONSTRUCTION PART 4: PUBLIC SANITARY SEWER <br />City of Little Canada, MN 2 of 2 Preliminary Engineer's Estimate
The URL can be used to link to this page
Your browser does not support the video tag.