My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12-01-2021 Council Packet
>
City Council Packets
>
2020-2029
>
2021
>
12-01-2021 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2022 4:05:46 PM
Creation date
2/9/2022 4:02:08 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
145
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF LITTLE CANADA <br />WOODLYNN AVE RECON - PRELIMINARY ENGINEERS ESTIMATE <br />QTY AMOUNT <br />TOTAL <br />UNIT UNIT COST <br />DATE: 10/31/21 <br />ITEM <br />NO. <br />MNDOT <br />SPEC.NO DESCRIPTION NOTES <br />41 2104.502 REMOVE CASTING & RINGS (STORM)EACH $250.00 1 $250 <br />42 2104.502 REMOVE DRAINAGE STRUCTURE EACH $600.00 2 $1,200 <br />43 2104.503 REMOVE SEWER PIPE (STORM)LF $8.00 36 $288 <br />44 2503.503 15" RC PIPE SEWER CLASS V LF $70.00 40 $2,800 <br />45 2503.503 18" RC PIPE SEWER CLASS V LF $85.00 20 $1,700 <br />46 2503.602 CONNECT TO EXISTING STORM SEWER EACH $750.00 3 $2,250 <br />47 2506.602 2'X3' CB, INCL CSTG AND AJD RINGS (DETAIL STO-5)EACH $3,000.00 3 $9,000 <br />48 2506.602 4' DIA STORM SEWER CBMH, INCL CSTG AND AJD RINGS (DETAIL STO-3) EACH $4,000.00 1 $4,000 <br />49 2506.602 18" RC FES EACH $2,500.00 1 $2,500 <br />50 2506.602 RECONSTRUCT DRAINAGE STRUCTURE EACH $3,000.00 2 $6,000 <br />51 2506.602 NEW RINGS AND CASTING (STORM)EACH $1,300.00 1 $1,300 <br />52 2511.507 RANDOM RIP RAP, CLASS 3 CY $120.00 40 $4,800 <br />$36,088 <br />$3,609 <br />$39,697 <br />$7,145 <br />$46,842 <br />52 2506.602 5' DIA STORM MANHOLE SPECIAL - SCICLONE EACH $15,000.00 <br />53 RETENTION BASIN EACH $75,000.00 <br />PROJECT SUBTOTALS (INCLUDES CONTINGENCY AND INDIRECT) <br />PART 1 - STREETS $439,036 <br />PART 2 - CURB AND GUTTER $57,534 <br />PART 3 - SANITARY SEWER $6,101 <br />PART 4 - WATERMAIN $93,456 <br />PART 5 - STORM SEWER $46,842 <br />PART 6 - RATE CONTROL, VOLUME REDUCTION, AND WATER QUALITY <br />PROJECT TOTAL $642,968 <br />PART 5: STORM SEWER - CONSTRUCTION SUBTOTAL <br />+10% CONTINGENCY <br />PART 5: STORM SEWER - CONSTRUCTION TOTAL <br />PART 5: STORM SEWER <br />PART 6: RATE CONTROL, VOLUME REDUCTION, AND WATER QUALITY - PROJECT TOTAL <br />PART 6: RATE CONTROL, VOLUME REDUCTION, AND WATER QUALITY <br />PART 6: RATE CONTROL, VOLUME REDUCTION, AND WATER QUALITY - CONSTRUCTION SUBTOTAL <br />+10% CONTINGENCY <br />PART 6: RATE CONTROL, VOLUME REDUCTION, AND WATER QUALITY - CONSTRUCTION TOTAL <br />18% ENGINEERING <br />18% ENGINEERING <br />PART 5: STORM SEWER - PROJECT TOTAL <br />Page 3 of 3
The URL can be used to link to this page
Your browser does not support the video tag.