CITY OF LITTLE CANADA <br />WOODLYNN AVE RECON - PRELIMINARY ENGINEERS ESTIMATE <br />QTY AMOUNT <br />TOTAL <br />UNIT UNIT COST <br />DATE: 10/31/21 <br />ITEM <br />NO. <br />MNDOT <br />SPEC.NO DESCRIPTION NOTES <br />24 2531.503 CONCRETE CURB AND GUTTER DESIGN B618 / SURMOUNTABLE LF $20.00 1600 $32,000 <br />25 2531.604 8" CONCRETE VALLEY GUTTER SY $85.00 145 $12,325 <br />$44,325 <br />$4,433 <br />$48,758 <br />$8,776 <br />$57,534 <br />32 2104.502 REMOVE FRAME AND RING CASTING (SANITARY)EACH $300.00 2 $600 <br />33 2506.602 NEW RINGS AND CASTING (SANITARY)EACH $1,300.00 2 $2,600 <br />34 2506.602 CHIMNEY SEAL (FLEX-SEAL)EACH $750.00 2 $1,500 <br />$4,700 <br />$470 <br />$5,170 <br />$931 <br />$6,101 <br />35 2104.602 REMOVE HYDRANT & VALVE EACH $1,200.00 3 $3,600 <br />36 2104.603 REMOVE HYDRANT LEAD LF $20.00 60 $1,200 <br />37 2105.509 SELECT GRANULAR BORROW CY $50.00 100 $5,000 <br />38 2504.602 HYDRANT AND VALVE EACH $10,000.00 3 $30,000 <br />39 2504.602 6" DIP HYDRANT LEAD LF $70.00 60 $4,200 <br />39 2506.602 REMOVE AND REPLACE GATE VALVE BOLTS EACH $1,750.00 8 $14,000 <br />40 2506.602 REMOVE AND REPLACE GATE VALVE BOX EACH $1,750.00 8 $14,000 <br />$72,000 <br />$7,200 <br />$79,200 <br />$14,256 <br />$93,456 <br />PART 3: SANITARY SEWER - CONSTRUCTION TOTAL <br />18% ENGINEERING <br />PART 3: SANITARY SEWER - PROJECT TOTAL <br />PART 4: WATERMAIN <br />PART 3: SANITARY SEWER - CONSTRUCTION SUBTOTAL <br />+10% CONTINGENCY <br />PART 2: NEW CURB AND GUTTER <br />PART 2: NEW CURB AND GUTTER - CONSTRUCTION SUBTOTAL <br />PART 3: SANITARY SEWER <br />PART 2: NEW CURB AND GUTTER - CONSTRUCTION TOTAL <br />18% ENGINEERING <br />PART 2: NEW CURB AND GUTTER - PROJECT TOTAL <br />+10% CONTINGENCY <br />PART 4: WATERMAIN - CONSTRUCTION SUBTOTAL <br />+10% CONTINGENCY <br />PART 4: WATERMAIN - CONSTRUCTION TOTAL <br />18% ENGINEERING <br />PART 4: WATERMAIN - PROJECT TOTAL <br />Page 2 of 3