My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10-14-2021 Planning Commission Packet
>
Agenda Packets
>
2020-2029
>
2021
>
10-14-2021 Planning Commission Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/10/2022 4:36:42 PM
Creation date
2/10/2022 4:19:33 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
320
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION OR REPORT WASPREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM ADULY REGISTERED ENGINEER UNDER THE LAWS OF THE STATE OFMINNESOTA.SIGNATURE:TYPED NAME:Timothy J. AuthDATE:09.24.2021 LICENSE NUMBER: 21087TT <br />T16"x10"16"x10"14"x10"SD-1 <br />150 CFM <br />12"x10" <br />SD-1 <br />100 CFM <br />SD-1 <br />75 CFM6"ø10"ø6"ø <br />10"ø <br />SD-1 <br />250 CFM <br />8"ø <br />1 <br />2 <br />SD-1 <br />150 CFM <br />8"ø8"ø <br />SD-1 <br />175 CFM <br />SD-1 <br />175 CFM <br />SD-1 <br />150 CFM <br />SD-1 <br />250 CFM <br />8"ø10"ø 10"x10"8"ø8"ø28"x10"RG-2 <br />175 CFM <br />RG-2 <br />175 CFM 8"ø8"ø28"x10"24"x10"20"x10" <br />RG-2 <br />250 CFM <br />RG-2 <br />250 CFM <br />RG-1 <br />750 CFM <br />10"x10"10"ø10"øSD-1 <br />265 CFM <br />SD-1 <br />265 CFM <br />10"ø 10"ø18"x10"6"øSD-1 <br />100 CFM <br />SD-2 <br />50 CFM <br />SD-1 <br />220 CFM <br />SD-1 <br />150 CFM <br />1 <br />10"x10" <br />10"x10"6"ø6"ø <br />8"ø <br />8"øSD-1 <br />150 CFM <br />SD-1 <br />150 CFM 14"x10"SD-1 <br />175 CFM <br />SD-1 <br />175 CFM <br />8"øSD-1 <br />300 CFM8"ø10"x10" 10"ø16"x10"28"x10"28"x10"RG-2 <br />220 CFM10"ø10"ø8"ø <br />8"ø RG-2 <br />175 CFM <br />RG-2 <br />175 CFM <br />RG-2 <br />300 CFM10"ø <br />RG-1 <br />1130 CFM <br />WALL CAP <br />TERMINATION (TYP.)8"ø <br />EF <br />3 <br />EF <br />18"ø8"ø <br />8"ø8"ø <br />8"ø <br />EF <br />2 8"ø8"øFFH <br />1 <br />FFH <br />2 <br />FFH <br />3 <br />RTU-1 <br />RTU-2 <br />28"x10" RETURN <br />DUCT UP TO RTU-2 <br />ON ROOF. <br />20"x18" SUPPLY <br />DUCT UP TO RTU-2 <br />ON ROOF. <br />28"x10" RETURN <br />DUCT UP TO RTU-1 <br />ON ROOF. <br />20"x18" SUPPLY <br />DUCT UP TO RTU-1 <br />ON ROOF.14"x10"8"ø <br />8"ø18"x10"6"ø <br />8"ø8"ø8"ø16"x10"16"x4" <br />16"x3" <br />SD-3 <br />125 CFM <br />VAULT VENT. <br />OFFSET <br />SD VAULT <br />114 <br />STORAGE <br />113 <br />MEMBER SERVICE <br />111 <br />COIN <br />120 <br />WAITING <br />112 <br />OFFICE <br />116 <br />OFFICE <br />117 <br />VEST. <br />100 <br />OFFICE <br />102 <br />OFFICE <br />103 <br />CONF. <br />104 <br />EXTERIOR STORAGE <br />108 <br />MECH. <br />107 <br />TOILET <br />106 <br />HALL <br />105 <br />BREAK <br />109 <br />IT <br />110 <br />LOBBY <br />101 <br />OFFICE <br />118 <br />OFFICE <br />115 <br />SD VIEWING <br />119 <br />8" <br />GAS METER BY UTIITY <br />2 PSI N.G., 258 MBH LOAD <br />3/4" GAS UP ALONG WALL <br />3/4" GAS UP TO <br />RTU-1 (108 MBH) <br />3/4" GAS UP TO <br />RTU-2 (150 MBH) <br />3/4"ø <br />3/4"ø <br />3/4"ø <br />(258 MBH) <br />3/4"ø <br />(258 MBH) <br />EF-3 <br />1 <br />12"x10" <br />14"0'2"4"8"0'4"8"16"0'1'2'4'0'8"16"32"0'16"32"64"0'2'4'8'0'4'8'16'0'8'16'32'SET TYPE -DATE: <br />DRAWN BY: <br />JOB NO: <br />PM:1/16" = 1'-0"1/8" = 1'-0"1/4" = 1'-0"1/2" = 1'-0"3/4" = 1'-0"1 1/2" = 1'-0"3" = 1'-0"3/8" = 1'-0"21 43 65 <br />21 43 65 <br />E <br />A <br />B <br />C <br />D <br />E <br />A <br />B <br />C <br />D <br />9/24/2021 12:26:24 PMBIM 360://21-068 RCU St. Paul/507-099-21 RCU - St.Paul.rvtST. PAUL OFFICEROYAL CREDIT UNION2640 RICE STREET, LITTLE CANADA, MN 5511309.24.21 <br />M101 PERMIT 09.24.21ABC <br />21-068 <br />MECHANICAL FLOOR PLAN <br />MECHANICAL KEYED NOTES: <br />1. DOOR TO BE UNDERCUT 3/4" BY G.C. <br />2. 16"x4" SUPPLY DUCT TO TIE INTO VAULT EXTERIOR VENT <br />CONNECTION. 16"x4" PRE FABRICATED OPENING OFFSETS AND <br />TERMINATES INSIDE OF VAULT. CONNECT 16"x4" DUCT TO <br />INTERIOR CONNECTION AND TRANSITION TO 16"x3" IN ORDER TO <br />CONNECT TO SUPPLY DIFFUSER. FIELD VERIFY EXACT LOCATION <br />OF VENT CONNECTIONS. <br />X <br />1/4" = 1'-0"M101 <br />1 MECHANICAL FLOOR PLAN <br />DWA <br />Auth Consulting/associates <br />406 TECHNOLOGY <br />DRIVE E. <br />SUITE A <br />MENOMONIE, WI 54751 <br />TEL: 715-232-8490 <br />CORPORATE OFFICE <br />2920 ENLOE <br />STREET <br />SUITE 101 <br />HUDSON, WI 54016 <br />TEL: 715-381-5277 <br />BRANCH OFFICE <br />S&N Land Surveying a division of A c/a <br />. <br />CONSULTANT: <br />authconsulting.com <br />E <br />S <br />W <br />NORTH <br />MARKDATEDESCRIPTION
The URL can be used to link to this page
Your browser does not support the video tag.